This is a Hurmu article. Click here for more information.

Hurmu Gate Network

From MicrasWiki
Revision as of 18:01, 29 April 2023 by Ric (talk | contribs)
Jump to navigationJump to search

The Hurmu Gate Network refers to the network of gates that allow for instantaneous transport between two gates through displacement of space-time.

The Hurmu Gate Network has been developed by the Hurmu Gate Institute and the Hurmu Gate Company.

All trips through the Gate Network were briefly put on hold from 2.VII.1703 for three months, due to the death of Kir Azariah Vidar during a solo transit from Huyenkula to Walstadt. An investigation identified breaches of standard operating procedures by a malcontented member of the hub control staff as the primary cause of the fractional gate misalignment incident. The gate resumed essential operations in support of the Hurmu Peace Corps during the Barikalus-Hurmu war thereafter.

Network

In order to travel between two gates, for example between Kaupang and Ghawlama, the Hub will arrange for opening the network between these gates at a given time. Then each gate must make it available for travel from the other. Since 1705, it has been possible to have parallel travelling, that is, trips can occur at the same time (e.g., one trip fron Huyenkula to Maltenstein, and another from Kaupang to Lindström), as long as the same stations are not being in use. The Hub coordinates all travels for security reasons.

The Hub cannot open a gate remotely (for security reasons), but can close a gate remotely if it does not close on its own. Similarly, the Hub can block a gate from accessing the network this way.

Country City Gate Status Opened Closed/Cancelled Comment
Benacian Union Benacian Union Chryse Chryse Gate Operational 1710
Port Esther Port Esther Gate Operational 1705
Eadriction Eadricton Gate Under construction 1719 Planned for 1719/1720
Constancia Constancia Aqaba Aqaba Gate Operational 1711
Raspur Raspur Gate Under construction 1719 Planned for 1719/1720
Craitland Craitland Cherry Trees Cherry Trees Gate Operational 1705
Floria Floria Northcliff Northcliff Gate Under construction 1724 Planned for 1724
Hurmu Hurmu Huyenkula Huyenkula Hub Operational 1692 Located by Huyenkula International Airport
Research Gate V1 Operational 1691 Located in the Hurmu Gate Institute campus
Senatorial Gate V2 Operational 1691 Located in the basement of the Palace of the Elenaran
Kaupang Kaupang Gate Operational 1691
Tyrador Tyrador Gate Closed in 1713 1716
New Hempton Samhold Gate Cancelled 1716
Datret Datret Gate Cancelled 1716
Hafnagaarð Amaland Gate Cancelled 1716
Enkhjargalbalgas Enkhjargalbalgas Gate Cancelled 1716
Niš Niš Gate Cancelled 1716
Natopia Natopia Lindström Lindström Gate Operational 1699
Walstadt Walstadt Gate Operational 1702
Geneva Geneva Gate Under construction 1720 Planned for 1720
Normark Normark Elijah's Rest (Konungsheim) Konungsheim Gate Operational 1711
Nouvelle Alexandrie Nouvelle Alexandrie Cárdenas Cárdenas Gate Under construction 1720 Planned for 1720
Punta Santiago Punta Santiago Gate Under construction 1721 Planned for 1721
Parap Parap Gate Under construction 1723 Planned for 1723
Sanama Sanama Semisa City Sanama City Gate Cancelled 1698 Construction halted in 1698
Shireroth Shireroth Maltenstein Gate Rumsɬæn-Maltenstein Operational 1698
Port Nevermore Nevermore Gate Under construction 1722 Planned for 1722
Tarsica New Lindström Tarsica Gate Operational 1709