Trans-Keltian Express: Difference between revisions

From MicrasWiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 64: Line 64:


|label61 = Map
|label61 = Map
|data61 = [[File:Trans-Keltian Express map.png|250px|border|Trans-Keltian Express route map]]
|data61 = [[File:Trans-Keltian Express map.png|250px|border|The planned route of the Trans-Keltian Express]]
|label62 = Route
|label62 = Route
|data62 = {{Trans-Keltian Express Route}}
|data62 = {{Trans-Keltian Express Route}}

Revision as of 13:26, 21 June 2020

Trans-Keltian Express
logo of the Trans-Keltian Express
Overview
Status In planning
Location Keltia
Termini Mercury Mercury, Elwynn Nordiskehjem
Stations TBD
Routes Mercury to Nordiskehjem (Line TK1)
Operation
Opened TBA 2021
Owner TBD
Operator(s) Various
Depot(s) Mercury, Mercury
Požun, Mercury
Hagbard, Normark
Technical
Track gauge TBD
Electrification TBD
Operating speed TBD
Route
Map The planned route of the Trans-Keltian Express
Route

The Trans-Keltian Express will be an international railway route initially spanning the northern regions of Keltia. The first phase of construction is planned to be a high-speed line between Mercury and Hagbard, thus connecting the Mercurian capital with all major cities of Normark through Normark's internal railway system, up and to Nordiskehjem in the north-west.

For Normark, the project includes building a railway crossing in the form of a tunnel over the Norse Gate, thus connecting Hagbard in the east of the Strait of Haifa with Signe in the west, and the rest of Normark.