Trans-Keltian Express: Difference between revisions
From MicrasWiki
Jump to navigationJump to search
No edit summary |
Continuator (talk | contribs) mNo edit summary |
||
| Line 70: | Line 70: | ||
The '''{{PAGENAME}}''' will be an international railway route initially spanning the northern regions of [[Keltia]]. The first phase of construction is planned to be a high-speed line between [[Mercury (city)|Mercury]] and [[Hagbard]], thus connecting the Mercurian capital with all major cities of [[Normark]] through Normark's internal railway system, up and to [[Nordiskehjem]] in the north-west. | The '''{{PAGENAME}}''' will be an international railway route initially spanning the northern regions of [[Keltia]]. The first phase of construction is planned to be a high-speed line between [[Mercury (city)|Mercury]] and [[Hagbard]], thus connecting the Mercurian capital with all major cities of [[Normark]] through Normark's internal railway system, up and to [[Nordiskehjem]] in the north-west. | ||
For [[Normark]], the project includes building a railway crossing in the form of a tunnel | For [[Normark]], the project includes building a railway crossing in the form of a tunnel under the [[Norse Gate]], thus connecting [[Hagbard]] in the east of the [[Strait of Haifa]] with [[Signe]] in the west, and the rest of Normark. | ||
[[Category:Transportation]] | [[Category:Transportation]] | ||
Revision as of 13:33, 21 June 2020
logo of the Trans-Keltian Express | |||||||||||||||||||||||||||||||
| Overview | |||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Status | In planning | ||||||||||||||||||||||||||||||
| Location | Keltia | ||||||||||||||||||||||||||||||
| Termini |
| ||||||||||||||||||||||||||||||
| Stations | TBD | ||||||||||||||||||||||||||||||
| Routes | Mercury to Nordiskehjem (Line TK1) | ||||||||||||||||||||||||||||||
| Operation | |||||||||||||||||||||||||||||||
| Opened | TBA 2021 | ||||||||||||||||||||||||||||||
| Owner | TBD | ||||||||||||||||||||||||||||||
| Operator(s) | Various | ||||||||||||||||||||||||||||||
| Depot(s) |
Mercury, Mercury Požun, Mercury Hagbard, Normark | ||||||||||||||||||||||||||||||
| Technical | |||||||||||||||||||||||||||||||
| Track gauge | TBD | ||||||||||||||||||||||||||||||
| Electrification | TBD | ||||||||||||||||||||||||||||||
| Operating speed | TBD | ||||||||||||||||||||||||||||||
| Route | |||||||||||||||||||||||||||||||
| Map |
| ||||||||||||||||||||||||||||||
| Route |
| ||||||||||||||||||||||||||||||
The Trans-Keltian Express will be an international railway route initially spanning the northern regions of Keltia. The first phase of construction is planned to be a high-speed line between Mercury and Hagbard, thus connecting the Mercurian capital with all major cities of Normark through Normark's internal railway system, up and to Nordiskehjem in the north-west.
For Normark, the project includes building a railway crossing in the form of a tunnel under the Norse Gate, thus connecting Hagbard in the east of the Strait of Haifa with Signe in the west, and the rest of Normark.
