Niš-Palanka highway
From MicrasWiki
(Redirected from Naisos-Bezimeni highway)
| |
| Construction started: | 15 December 2017 |
| Construction finished: | 25 December 2017 |
|
| |
| Country: | |
|
| |
| Important cities on the highway: | Niš Palanka |
| Construction works done by: | Nohavland Construction |

The Niš-Palanka highway was built during the Srbozemskan era by Nohavland Construction (currently: Srbozemska Construction). Today, 33 km is located in the Order of the Holy Lakes and 540 km in Çakaristan. In Çakaristan, the highway is numbered NH 60. In Mitrovska and Niš, this highway is numbered as Z5.