Intan Wan Pat Cyborges-Rimba Raya Bridge-Tunnel
From MicrasWiki
| This article or section is a work in progress. The information below may be incomplete, outdated, or subject to change. |
Intan Wan Pat Cyborges-Rimba Raya Bridge-Tunnel Jambatan-Terowong Intan Wan Pat Cyborges-Rimba Raya | |
| Carries | Motor vehicles and double-track rails |
|---|---|
| Crosses | Strait of Amrok and Strait of Ïeu'ryïan, Captive Sea |
| Locale | |
| Other name(s) | Jambatan Selat Amrok, Jambatan Intan Wan Pat |
| Owner | Phinbellan Construction Pioneer Agency |
| Maintained by | Phinbellan Expressway Authority (PhEX), PhR Dependencies |
| Characteristics | |
| Design | Bridge–tunnel system |
| Total length |
388.82 km (motor vehicles) 397.12 km (railway) |
| Width | 34.8 metres |
| No. of spans | 12 |
| No. of lanes | 5 lanes per direction |
| Rail characteristics | |
| No. of tracks | Double track rail tunnel |
| Track gauge |
|
| Electrified | 25 kV AC, 50 Hz |
| Operating speed |
200 km/h
|
| History | |
| Designer | Government of Phinbella, Phinbellan Public Works Board (LKRP), Naiwoo Designer |
| Construction start | 20 January RP 2605 |
| Construction end | 20 January RP 2615 |
| Construction cost | ðh1,872 billion |
| Opened | 20 April RP 2615, 09:00 PHT (CMT+4) |
| Inaugurated | 19 April RP 2615 |
| Statistics | |
| Toll | ðƒ10 - ðƒ40; Free for car on occasion Phinbellan holiday, including Ramadhan, Eid al-Fitr and Eid al-Adha. |
| Location | |
| References | |