Parap MetroRail System: Difference between revisions
No edit summary |
No edit summary |
||
Line 376: | Line 376: | ||
When the Metro is closed, two night train services are run at 2:00 and 4:00 pm, except on Fridays and Saturdays, when a single night service is run at 4:00 pm. It follows the same routes and stops at the same stations. | When the Metro is closed, two night train services are run at 2:00 and 4:00 pm, except on Fridays and Saturdays, when a single night service is run at 4:00 pm. It follows the same routes and stops at the same stations. | ||
[[Category:Railways]] | [[Category:Railways]] | ||
[[Category:Transportation in Nouvelle Alexandrie]] |
Revision as of 16:47, 30 March 2023
Parap MetroRail Parap Libertad Metro Station | |
Native name | MetroRail de Parap |
---|---|
Owner | Parap MetroRail Company |
Locale | Parap |
Transit type | Rapid transpit |
Number of lines | 2 |
Number of stations | 45 |
Daily ridership | 268,493 (1718 AN) |
Annual ridership | 98 million (1715 AN) |
Began operation | 1690 AN |
Operator | Parap MetroRail Company |
Headway | 8 minutes |
Number of vehicles |
32 (active) 14 (reserve) |
System length | 35.8 km (22.4 mi) |
Track gauge | 1435 mm (4 ft 8 1⁄2 in) |
Average speed | 64 km/h (40 mph) |
Top speed | 100 km/h (62 mph) |
The Parap MetroRail System, also known as the Parap Metro, is an urban rail transportation system that serves the city of Parap, capital of the Wechua Nation. Construction began in 1686 AN as part of the New Prosperity Plan. It is financed by the federal government but was handed over to a public-private partnership upon completion. The system consists of 2 lines which have a total of 43 stations across a length of 35.8 km.
Since the opening of the network, the TR-80 has been used, with no plans to introduce the TR-100 into the network.
Rolling stock
Designation | Producer | Total Units | Units in service | Power output | Top speed | Years built | Image |
---|---|---|---|---|---|---|---|
TR-80 'Subway' | TR | 32 | 22 | 2000 kW | 100 km/h (62 mph) | 17690-1705 AN |
Lines
# | Line | Opened | Last extension | Stations Served | Length | Average interstation | Journeys made (1707 AN) | Termini | Rolling Stock | Conduction system |
---|---|---|---|---|---|---|---|---|---|---|
1 | Line A | 1690 AN | 1708 AN | 21 | 19.2 km / 12 mi | 650 m / 2,130 ft | 324.8 million | Haciepa Sud
Juasilia |
TR-100 | Automatic |
2 | Line B | 1690 AN | 1704 AN | 24 | 16.6 km / 10.3 mi | 870 m / 2,850 ft | 224.5 million | Aeropuerto
Merquel |
TR-100 | Automatic |
Stations
Line A
Line A runs north to south, connecting much of the city center to the Central Station. It connects to Line B at the Central Station. It is identified by the colour Blue.
The Line was approved with Line B in 1686 AN, with construction taking 4 years. It was opened between Colina de la Empresa and Haciepa Mercado in 1690 AN. The line runs underground until Haciepa Mercado. The extension to Haciepa Sud opened in 1698 AN. The extension to Juasília followed in 1704 AN. Two more fill-in stations opened in 1708 AN. It is especially popular as a connection between the Finance District, University, and Central Station.
Name | Connections | Date opened | Platforms | Namesake |
---|---|---|---|---|
Haciepa Sud | 1700 AN | 3 | Haciepa barrio, south end | |
Haciepa Centrale | 1700 AN | 2 | Haciepa barrio | |
Haciepa Mercado | 1690 AN | 3 | Haciepa barrio, marketplace | |
Antolos | 1690 AN | 2 | Waylla Ninahuamán Antolos, writer | |
Universidad | 1690 AN | 2 | University of Parap | |
Banco | 1690 AN | 2 | City Bank | |
Plaza del Sol | 1690 AN | 2 | Sun Square | |
Bolsa | 1690 AN | 2 | Parap Stock Exchange | |
Parap Libertad | Line B | 1690 AN | 4 | Parap Libertad Train Station |
Wechua Avenue | 1690 AN | 2 | Wechua Nation | |
Atfael | 1690 AN | 2 | Atfael barrio | |
Ibicife | 1708 AN | 2 | Ibicife barrio | |
Hata | 1690 AN | 2 | Thani Choque Hata, biologist | |
Estadio | 1690 AN | 2 | City Stadium | |
Plaza de Armas | 1690 AN | 2 | City Arsenal | |
Pamache | 1708 AN | 2 | Pamache barrio | |
Ciudadela | 1690 AN | 2 | City Citadel | |
Colina de la Empresa | 1690 AN | 3 | Company Hill | |
Trinicioho | 1704 AN | 2 | Qhispisisa Quispe Trinicioho, politician | |
Penbuco | 1704 AN | 2 | Penbuco barrio | |
Juasíla | 1704 AN | 3 | Juasíla |
Line B
Line B runs west to east, connecting the Parap International Airport to the Central Station, as well as the city center. Connects to Line A at the Central Station. It is identified by the colour Red.
The Line was approved with Line A in 1686 AN. It was finished 2 months after A. It was opened between Hualvilca and Vallelos 1690 AN. The line runs underground up to San Juan in the west, and Vallelos to the east. The extension to the Airport opened in 1694 AN. The extension to Merquel followed in 1704 AN. The line is used by tourists extensively, as the direct link between the airport and central station.
Name | Connections | Date opened | Platforms | Namesake |
---|---|---|---|---|
Aeropuerto | 1694 AN | 3 | Parap International Airport | |
P+R Cardolatí | 1694 AN | 2 | Cardolatí barrio, Park & Ride | |
Cardolatí Centrale | 1694 AN | 2 | Cardolatí barrio | |
San Juan | 1694 AN | 2 | San Juan Cathedral | |
Hualvilca | 1690 AN | 3 | Hualvilca barrio | |
Limcia | 1690 AN | 2 | Limcia barrio | |
Dolova | 1690 AN | 2 | Atau Hualla Dolova, historian | |
Qieda | 1690 AN | 2 | Qieda barrio | |
Ypawa | 1690 AN | 2 | Ypawa barrio | |
Caaputora | 1690 AN | 2 | Caaputora barrio | |
Patuy | 1690 AN | 2 | Patuy barrio | |
Plaza Paloma | 1690 AN | 2 | Dove Square | |
Plaza Dorada | 1690 AN | 2 | Gold Square | |
Plaza Réal | 1690 AN | 2 | Royal Square & Palace | |
Parap Libertad | Line A | 1690 AN | 2 | Parap Libertad Train Station |
Teatro | 1690 AN | 2 | City Theater | |
Hospital | 1690 AN | 2 | City Hospital | |
Buital | 1690 AN | 2 | Buital barrio | |
Parque Ciudad | 1690 AN | 2 | City Park | |
Vallelos | 1690 AN | 3 | Qorisia Yacupaico Vallelos, politician | |
Virembó | 1704 AN | 2 | Virembó barrio | |
Merquel | 1704 AN | 3 | Urpiyurac Motocanchi Merquel, writer |
Stations
served 24 hours a day. Underground stations in Cárdenas are typically accessed by staircases going down from street level. Many of these staircases are painted in red, with slight or significant variations in design for each station. Several stations are built underneath other buildings and have accesses inside or adjacent to it. All entrances have yellow square lights and signs with 'Metro'.
Concourse
Most stations in the subway system have mezzanines. Mezzanines allow for passengers to enter from multiple locations at an intersection and proceed to the correct platform without having to cross the street before entering. Inside mezzanines are fare control areas, where passengers physically pay their fare to enter the subway system. Many elevated stations also have platform-level fare control with no common station house between directions of service.
Paying for subway services can be done in station booths or vending machines. There is a physical ticket system, as well as a digital contactless smart card known as TarjetaMetro. These smart cards can be swiped at a turnstile, customers enter the fare-controlled area of the station and continue to the platforms. Special 'Waiting Areas' are available in most underground stations, consisting of benches and identified by a yellow sign.
Platforms
A typical subway station has waiting platforms ranging from 150 to 180 m (450 to 600 ft). Some are longer. Most stations have platforms serving one line, but some share lines. Overhead electronic boards show which trains stop where and when. Identification is also available on the front and sides of the trains.
There are several common platform configurations. Most single line stations, especially above ground, have two side platforms. Double and multi-line stations have at least one island platform. End stations also have an island platform.
Accesibility
The network was built with facilities for Disabled people in mind. Most are handicapped-accessible, including wheelchair-friendly turnstiles. Street elevators are available for many stations. Many stations also have both staircases and escalators.
Service
Fares
Riders pay a single fare to enter the subway system and may transfer between trains at no extra cost until they exit via station turnstiles; the fare is a flat rate regardless of how far or how long the rider travels. Thus, riders must swipe their physical ticket, TarjetaMetro, or smartphone on an reader at the turnstile upon entering the subway system, but not a second time upon leaving.
As of 1716 AN, the base fare is NAX€2.25 with the last fare increase occuring on II.1715 AN. Fares can be paid with most credit or debit cards (including smartphone pay), with a reusable TarjetaMetro, or with single-use tickets. The PMRC offers 7-day (at €14.50) and 30-day (at €60.00) unlimited ride programs that can lower the effective per-ride fare significantly. Reduced fares are available for the elderly and people with disabilities (at €1.65).
Operating hours
Service starts at 5:30 am and ends at about 12:00 pm. On Fridays and Saturdays, services end later, at about 1:30 pm.
When the Metro is closed, two night train services are run at 2:00 and 4:00 pm, except on Fridays and Saturdays, when a single night service is run at 4:00 pm. It follows the same routes and stops at the same stations.