Next Generation Corvette project: Difference between revisions
From MicrasWiki
Jump to navigationJump to search
| Line 8: | Line 8: | ||
===A design=== | ===A design=== | ||
{{unbulleted list|'''Displacement:''' 850 t|'''Length:''' 74 m|'''Beam:''' 10.5 m|'''Complement:''' 50 crew, 20 passengers|'''Speed:''' 65+ km/h|''' | {{unbulleted list|'''Displacement:''' 850 t|'''Length:''' 74 m|'''Beam:''' 10.5 m|'''Complement:''' 50 crew, 20 passengers|'''Propulsion:''' Faca gas turbine|'''Speed:''' 65+ km/h|'''Range:''' 5,500 km|'''Endurance:''' 21 days|'''Sensors:''' {{unbulleted list|Phased array|Multi-mission naval radar|Combat management system|Integrated communication system}}|'''Armament:''' {{unbulleted list|76 mm naval gun|8 anti-ship missiles|16 anti-air missiles|6 torpedo tubes|Mines|2 general purpose machine guns}}|'''Aircraft:''' {{unbulleted list|One helicopter|Small UAV}}}} | ||
[[Category:Military]] | [[Category:Military]] | ||
Revision as of 21:12, 8 February 2020
The Next Generation Corvette project is a development programme managed by Sanama State Maritime Industries. The stated goal of the project is to produce a modern and capable corvette to fill the patrol, littoral sea control and near-coast anti-submarine warfare roles. It is slated to replace the Elwynn-class corvette and Klimatariá-class missile corvette currently in service with the Sanaman Navy. It will also be offered to other members of the Raspur Pact.
Expected characteristics
A design
- Displacement: 850 t
- Length: 74 m
- Beam: 10.5 m
- Complement: 50 crew, 20 passengers
- Propulsion: Faca gas turbine
- Speed: 65+ km/h
- Range: 5,500 km
- Endurance: 21 days
- Sensors:
- Phased array
- Multi-mission naval radar
- Combat management system
- Integrated communication system
- Armament:
- 76 mm naval gun
- 8 anti-ship missiles
- 16 anti-air missiles
- 6 torpedo tubes
- Mines
- 2 general purpose machine guns
- Aircraft:
- One helicopter
- Small UAV