This is an article about the Alduro-Wechua Federation. Do you want to know more?

Parap MetroRail System: Difference between revisions

From MicrasWiki
Jump to navigationJump to search
No edit summary
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
{{Infobox|label10=Began operation|data11=Parap MetroRail Company|data8=268,493 (1718 [[AN]])|data7=45|data6=2|data5=[[wikipedia:Rapid transit|Rapid transpit]]|data4=[[Parap]]|data3=[[Parap MetroRail Company]]|data2=MetroRail de Parap|data18=[[File:ParapMetroRail.png|300px]]|data17=100 km/h (62 mph)|data16=64 km/h (40 mph)|data15=1435 mm (4 ft 8 1⁄2 in)|data14=35.8 km (22.4 mi)|data13=32 (active) <br> 14 (reserve)|data12=8 minutes|data10=1690 [[AN]]|label11=Operator|label2=Native name|label12=[[wikipedia:Headway|Headway]]|label13=Number of vehicles|label14=System length|label15=Track gauge|label16=Average speed|label17=Top speed|label3=Owner|data1=<big>'''Parap MetroRail'''</big><br>[[File:Parap-Metrorail.jpg|350px]]<br>Parap Libertad Metro Station|label4=Locale|label5=Transit type|label6=Number of lines|label7=Number of stations|label8=Daily ridership|label9=Annual ridership|data9=98 million (1715 [[AN]])}}{{Alduria-Wechua Article}}
{{Infobox|label10=Began operation|data11=Parap MetroRail Company|data8=326,027 (1718 [[AN]])|data7=61|data6=3|data5=[[wikipedia:Rapid transit|Rapid transpit]]|data4=[[Parap]]|data3=[[Parap MetroRail Company]]|data2=MetroRail de Parap|data18=[[File:ParapMetroRail.png|300px]]|data17=100 km/h (62 mph)|data16=64 km/h (40 mph)|data15=1435 mm (4 ft 8 1⁄2 in)|data14=49.2 km (30.8 mi)|data13=46 (active) <br> 12 (reserve)|data12=8 minutes|data10=1690 [[AN]]|label11=Operator|label2=Native name|label12=[[wikipedia:Headway|Headway]]|label13=Number of vehicles|label14=System length|label15=Track gauge|label16=Average speed|label17=Top speed|label3=Owner|data1=<big>'''Parap MetroRail'''</big><br>[[File:Parap-Metrorail.jpg|350px]]<br>Parap Libertad Metro Station|label4=Locale|label5=Transit type|label6=Number of lines|label7=Number of stations|label8=Daily ridership|label9=Annual ridership|data9=119 million (1718 [[AN]])}}{{Alduria-Wechua Article}}
The '''Parap MetroRail System''', also known as ''the Parap Metro'', is an urban rail transportation system that serves the city of [[Parap]], capital of the [[Wechua Nation]]. Construction began in {{AN|1686}} as part of the [[New Prosperity Plan]]. It is financed by the federal government but was handed over to a public-private partnership upon completion. The system consists of 2 lines which have a total of 43 stations across a length of 35.8 km.  
The '''Parap MetroRail System''', also known as ''the Parap Metro'', is an urban rail transportation system that serves the city of [[Parap]], capital of the [[Wechua Nation]]. Construction began in {{AN|1686}} as part of the [[New Prosperity Plan]]. It is financed by the federal government but was handed over to a public-private partnership upon completion. The system consists of 2 lines which have a total of 43 stations across a length of 35.8 km.  


Line 17: Line 17:
|[[TR-80 'Subway']]
|[[TR-80 'Subway']]
|[[Tránsito Rápido|TR]]
|[[Tránsito Rápido|TR]]
|32
|58
|22
|46
|2000 kW
|2000 kW
|100 km/h (62 mph)
|100 km/h (62 mph)
Line 34: Line 34:
!Length
!Length
!Average interstation
!Average interstation
!Journeys made ({{AN|1707}})
!Journeys made ({{AN|1718}})
!Termini
!Termini
!Rolling Stock
!Rolling Stock
Line 42: Line 42:
|Line A
|Line A
|{{AN|1690}}
|{{AN|1690}}
|{{AN|1708}}
|{{AN|1718}}
|21
|21
|19.2 km / 12 mi
|19.2 km / 12 mi
|650 m / 2,130 ft
|650 m / 2,130 ft
|324.8 million
|468.9 million
|Haciepa Sud
|Vistapuquio
Juasilia
Hilachija
 
Plaza Mercantil
|[[TR-100 'Super-Subway'|TR-100]]
|[[TR-100 'Super-Subway'|TR-100]]
|Automatic
|Automatic
Line 55: Line 57:
|Line B
|Line B
|{{AN|1690}}
|{{AN|1690}}
|{{AN|1704}}
|{{AN|1718}}
|24
|24
|16.6 km / 10.3 mi
|16.6 km / 10.3 mi
|870 m / 2,850 ft
|870 m / 2,850 ft
|224.5 million
|224.5 million
|Aeropuerto
|Aeropuerto T2
Merquel
Merquel Este
|[[TR-100 'Super-Subway'|TR-100]]
|Automatic
|-
|3
|Line C
|{{AN|1718}}
|{{AN|1718}}
|20
|13.4 km / 84 mi
|540 m / 1,800 ft
|39.7 million
|Circular Line
|[[TR-100 'Super-Subway'|TR-100]]
|[[TR-100 'Super-Subway'|TR-100]]
|Automatic
|Automatic
Line 71: Line 85:
Line A runs north to south, connecting much of the city center to the Central Station. It connects to Line B at the Central Station. It is identified by the colour Blue.
Line A runs north to south, connecting much of the city center to the Central Station. It connects to Line B at the Central Station. It is identified by the colour Blue.


The Line was approved with Line B in {{AN|1686}}, with construction taking 4 years. It was opened between Colina de la Empresa and Haciepa Mercado in {{AN|1690}}. The line runs underground until Haciepa Mercado. The extension to Haciepa Sud opened in {{AN|1698}}. The extension to Juasília followed in {{AN|1704}}. Two more fill-in stations opened in {{AN|1708}}. It is especially popular as a connection between the Finance District, University, and Central Station.
The Line was approved with Line B in {{AN|1686}}, with construction taking 4 years. It was opened between Colina de la Empresa and Haciepa Mercado in {{AN|1690}}. The line runs underground until Haciepa Mercado. The extension to Haciepa Sud opened in {{AN|1698}}. The extension to Juasília followed in {{AN|1704}}. Two more fill-in stations opened in {{AN|1708}}. As part of 'Nueva Década' program, the extensions to Hilachija and Vistapuquio, and the Company Hill branch, were opened in {{AN|1718}}. It is especially popular as a connection between the Finance District, University, and Central Station.
{| class="wikitable mw-collapsible mw-collapsed"
{| class="wikitable mw-collapsible mw-collapsed"
!Name
!Name
Line 78: Line 92:
!Platforms
!Platforms
!Namesake
!Namesake
|-
|Vistapuquio
|
|{{AN|1718}}
|3
|Vistapuquio town
|-
|-
|Haciepa Sud
|Haciepa Sud
Line 116: Line 136:
|-
|-
|Plaza del Sol
|Plaza del Sol
|
|Line C
|{{AN|1690}}
|{{AN|1690}}
|2
|4
|Sun Square
|Sun Square
|-
|-
Line 132: Line 152:
|4
|4
|Parap Libertad Train Station
|Parap Libertad Train Station
|-
|Quri Wasa
|
|{{AN|1718}}
|2
|Gold House Temple
|-
|-
|Wechua Avenue
|Wechua Avenue
Line 140: Line 166:
|-
|-
|Atfael
|Atfael
|
|Line C
|{{AN|1690}}
|{{AN|1690}}
|2
|4
|Atfael barrio
|Atfael barrio
|-
|-
Line 186: Line 212:
|3
|3
|Company Hill
|Company Hill
|-
|Tecnópolis
|
|{{AN|1718}}
|2
|Technology Town
|-
|Centro Corporativo
|
|{{AN|1718}}
|2
|Corporate Center Tower
|-
|Plaza Mercantil
|
|{{AN|1718}}
|3
|Merchant's Plaza
|-
|-
|Trinicioho
|Trinicioho
Line 203: Line 247:
|{{AN|1704}}
|{{AN|1704}}
|3
|3
|Juasíla
|Juasíla barrio
|-
|Curatella
|
|{{AN|1718}}
|2
|Curatella barrio
|-
|Hilachija
|
|{{AN|1718}}
|3
|Hilachija barrio
|}
|}


Line 209: Line 265:
Line B runs west to east, connecting the [[Parap International Airport]] to the Central Station, as well as the city center. Connects to Line A at the Central Station. It is identified by the colour Red.
Line B runs west to east, connecting the [[Parap International Airport]] to the Central Station, as well as the city center. Connects to Line A at the Central Station. It is identified by the colour Red.


The Line was approved with Line A in {{AN|1686}}. It was finished 2 months after A.  It was opened between Hualvilca and Vallelos {{AN|1690}}. The line runs underground up to San Juan in the west, and Vallelos to the east. The extension to the Airport opened in {{AN|1694}}. The extension to Merquel followed in {{AN|1704}}. The line is used by tourists extensively, as the direct link between the airport and central station.  
The Line was approved with Line A in {{AN|1686}}. It was finished 2 months after A.  It was opened between Hualvilca and Vallelos {{AN|1690}}. The line runs underground up to San Juan in the west, and Vallelos to the east. The extension to the Airport opened in {{AN|1694}}. The extension to Merquel followed in {{AN|1704}}. As part of the 'Nueva Decáda' program, the extension to Merquel Este and T2 opened in {{AN|1718}}. The line is used by tourists extensively, as the direct link between the airport and central station.  
{| class="wikitable mw-collapsible mw-collapsed"
{| class="wikitable mw-collapsible mw-collapsed"
!Name
!Name
Line 216: Line 272:
!Platforms
!Platforms
!Namesake
!Namesake
|-
|Terminal 2
|
|{{AN|1718}}
|3
|Airport Terminal 2
|-
|-
|Aeropuerto
|Aeropuerto
Line 289: Line 351:
|Dove Square
|Dove Square
|-
|-
|Plaza Dorada
|Plaza Corazón
|
|{{AN|1718}}
|2
|Heart Square
|-
|Zoo
|Line C
|{{AN|1718}}
|4
|City Zoo
|-
|Puerta Dorada
|
|
|{{AN|1690}}
|{{AN|1690}}
|2
|2
|Gold Square
|Golden Gate
|-
|-
|Plaza Réal
|Plaza Réal
Line 326: Line 400:
|-
|-
|Parque Ciudad
|Parque Ciudad
|
|Line C
|{{AN|1690}}
|{{AN|1690}}
|2
|2
Line 347: Line 421:
|{{AN|1704}}
|{{AN|1704}}
|3
|3
|Urpiyurac Motocanchi Merquel, writer
|Merquel barrio
|-
|Merquel Este
|
|{{AN|1718}}
|3
|Merquel barrio, east end
|}
 
=== Line C ===
Line C is the city circular line, connecting the central conurbation to the city center and bypassing Parap Libertad station.It connects to both Line A and B twice, and has a small branch in the northeast. It is identified by the colour green.
 
The Line was the key project in the 'Nueva Decáda' program, started in {{AN|1715}}. Its tunelling took more than 3 years, and was opened in {{AN|1718}}. The line runs entirely underground. The line is popular with commuters, as well as a relief line for connecting at Parap Libertad, which was getting overcrowded by {{AN|1712}}.
{| class="wikitable mw-collapsible mw-collapsed"
!Name
!Connections
!Date opened
!Platforms
!Namesake
|-
|Quilcayán
|
|{{AN|1718}}
|3
|Quilcayán barrio
|-
|Sanquillo
|
|{{AN|1718}}
|2
|Sanquillo neighborhood, Quilcayán
|-
|Wamanwasi
|
|{{AN|1718}}
|3
|Wamanwasi neighborhood, Atfael
|-
|Brisaviva
|
|{{AN|1718}}
|2
|Brisaviva neighborhood, Atfael
|-
|Atfael
|Line A
|{{AN|1718}}
|2
|Atfael barrio
|-
|Almendros
|
|{{AN|1718}}
|2
|Almond Trees Park
|-
|Marisma Azul
|
|{{AN|1718}}
|2
|Blue Marshlands neighborhood, Kkisukuy Illaqta
|-
|Mirador del Sol
|
|{{AN|1718}}
|2
|Sun Viewpoint Theater
|-
|Pachamama
|
|{{AN|1718}}
|2
|Mother Earth park
|-
|Zoo
|Line B
|{{AN|1718}}
|2
|City Zoo
|-
|Robledal
|
|{{AN|1718}}
|2
|Oak Trees neighborhood, Illaqta Ukhupi
|-
|Uyu
|
|{{AN|1718}}
|2
|Uyu neighborhood, Illaqta Ukhupi
|-
|Plaza del Sol
|Line A
|{{AN|1718}}
|2
|Sun Square
|-
|Verdesol
|
|{{AN|1718}}
|2
|Verdesol neighborhood, Illaqta Ukhupi
|-
|Almalinda
|
|{{AN|1718}}
|2
|Almalinda neighborhood, Illaqta Ukhupi
|-
|Tikanayra
|
|{{AN|1718}}
|2
|Tikanayra neighborhood, Illaqta Ukhupi
|-
|Llank'aylla
|
|{{AN|1718}}
|2
|Llank'aylla neighborhood, Buital
|-
|Parque Ciudad
|Line B
|{{AN|1718}}
|2
|City Park
|-
|Yanantin
|
|{{AN|1718}}
|2
|Yanantin neighborhood, Buital
|-
|Pachamaki
|
|{{AN|1718}}
|3
|Pachamaki neighborhood, Quilcayán
|}
|}
==Stations==
==Stations==
served 24 hours a day. Underground stations in Cárdenas are typically accessed by staircases going down from street level. Many of these staircases are painted in red, with slight or significant variations in design for each station. Several stations are built underneath other buildings and have accesses inside or adjacent to it. All entrances have yellow square lights and signs with 'Metro'.
Most stations are served 24 hours a day. Underground stations in Cárdenas are typically accessed by staircases going down from street level. Many of these staircases are painted in red, with slight or significant variations in design for each station. Several stations are built underneath other buildings and have accesses inside or adjacent to it. All entrances have yellow square lights and signs with 'Metro'.


===Concourse===
===Concourse===
Line 375: Line 587:


When the Metro is closed, two night train services are run at 2:00 and 4:00 pm, except on Fridays and Saturdays, when a single night service is run at 4:00 pm. It follows the same routes and stops at the same stations.
When the Metro is closed, two night train services are run at 2:00 and 4:00 pm, except on Fridays and Saturdays, when a single night service is run at 4:00 pm. It follows the same routes and stops at the same stations.
=== Wi-fi ===
Following the [[Cárdenas Metro]], [[Wikipedia:Wi-fi|Wi-fi]] was installed on the PMR in {{AN|1710}} for most stations and trains. It is a free service. The network is connected through 4G services, including within tunnels.
== Safety and Security ==
===Signaling===
Most routes use [https://en.wikipedia.org/wiki/Railway_signalling#Block_signalling block signalling], but several routes have been retrofitted with [https://en.wikipedia.org/wiki/Communications-based_train_control communication-based train control], which would allow trains to run without conductor input.
====Wayside block signaling====
Much of the system currently uses [https://en.wikipedia.org/wiki/Automatic_block_signaling automatic block signaling] with fixed wayside signals and automatic [https://en.wikipedia.org/wiki/Train_stop train stops] to provide safe train operation across the whole system. These signals work by preventing trains from entering a "block" occupied by another train. Typically, the blocks are 300 m (1,000 ft) long. Red and green lights show whether a block is occupied or vacant. The train's maximum speed will depend on how many blocks are open in front of it. The signals do not register a train's speed, nor where in the block the train is located.
Subway trains are stopped mechanically at all signals showing "stop". To make train stops safe and effective, wayside trippers must not be moved to trip ("stop") position until the train has fully passed.
====Communications-based train control====
Following the FDTA in [[Cárdenas]], the PMRC has started installing CBTC, which supplements rather than replaces the fixed-block signal system; it allows trains to operate more closely together with lower headways. Due to the success of the system, additional cars were ordered to service the system. Lines A and B were the first to be outfitted with this. Lines G, H, and I were built with CBTC in mind. The PMRC has operated it in conjunction with [https://en.wikipedia.org/wiki/One-person_operation OPTO] since {{AN|1715}}. It has done all this in combination with the system known as the Automatic Metro Supervision (AMS). AMS allows dispatchers in the Operations Control Center (OCC) to see where trains are in real time, and whether each individual train is running early or late. Dispatchers can hold trains for connections, re-route trains, or short-turn trains to provide better service when a disruption causes delays.
== See also ==
* [[Rail transport in Nouvelle Alexandrie]]
* [[Cárdenas Metro]]
* [[Punta Santiago Metro]]
[[Category:Railways]]
[[Category:Railways]]
[[Category:Transportation in Nouvelle Alexandrie]]
[[Category:Transportation in Nouvelle Alexandrie]]
[[Category:Parap]]

Latest revision as of 22:43, 22 September 2024

Parap MetroRail
Parap-Metrorail.jpg
Parap Libertad Metro Station
Native name MetroRail de Parap
Owner Parap MetroRail Company
Locale Parap
Transit type Rapid transpit
Number of lines 3
Number of stations 61
Daily ridership 326,027 (1718 AN)
Annual ridership 119 million (1718 AN)
Began operation 1690 AN
Operator Parap MetroRail Company
Headway 8 minutes
Number of vehicles 46 (active)
12 (reserve)
System length 49.2 km (30.8 mi)
Track gauge 1435 mm (4 ft 8 1⁄2 in)
Average speed 64 km/h (40 mph)
Top speed 100 km/h (62 mph)
ParapMetroRail.png

The Parap MetroRail System, also known as the Parap Metro, is an urban rail transportation system that serves the city of Parap, capital of the Wechua Nation. Construction began in 1686 AN as part of the New Prosperity Plan. It is financed by the federal government but was handed over to a public-private partnership upon completion. The system consists of 2 lines which have a total of 43 stations across a length of 35.8 km.

Since the opening of the network, the TR-80 has been used, with no plans to introduce the TR-100 into the network.

Rolling stock

Designation Producer Total Units Units in service Power output Top speed Years built Image
TR-80 'Subway' TR 58 46 2000 kW 100 km/h (62 mph) 17690-1705 AN TR-80 'Subway' .jpg

Lines

# Line Opened Last extension Stations Served Length Average interstation Journeys made (1718 AN) Termini Rolling Stock Conduction system
1 Line A 1690 AN 1718 AN 21 19.2 km / 12 mi 650 m / 2,130 ft 468.9 million Vistapuquio

Hilachija

Plaza Mercantil

TR-100 Automatic
2 Line B 1690 AN 1718 AN 24 16.6 km / 10.3 mi 870 m / 2,850 ft 224.5 million Aeropuerto T2

Merquel Este

TR-100 Automatic
3 Line C 1718 AN 1718 AN 20 13.4 km / 84 mi 540 m / 1,800 ft 39.7 million Circular Line TR-100 Automatic

Stations

Line A

Line A runs north to south, connecting much of the city center to the Central Station. It connects to Line B at the Central Station. It is identified by the colour Blue.

The Line was approved with Line B in 1686 AN, with construction taking 4 years. It was opened between Colina de la Empresa and Haciepa Mercado in 1690 AN. The line runs underground until Haciepa Mercado. The extension to Haciepa Sud opened in 1698 AN. The extension to Juasília followed in 1704 AN. Two more fill-in stations opened in 1708 AN. As part of 'Nueva Década' program, the extensions to Hilachija and Vistapuquio, and the Company Hill branch, were opened in 1718 AN. It is especially popular as a connection between the Finance District, University, and Central Station.

Name Connections Date opened Platforms Namesake
Vistapuquio 1718 AN 3 Vistapuquio town
Haciepa Sud 1700 AN 3 Haciepa barrio, south end
Haciepa Centrale 1700 AN 2 Haciepa barrio
Haciepa Mercado 1690 AN 3 Haciepa barrio, marketplace
Antolos 1690 AN 2 Waylla Ninahuamán Antolos, writer
Universidad 1690 AN 2 University of Parap
Banco 1690 AN 2 City Bank
Plaza del Sol Line C 1690 AN 4 Sun Square
Bolsa 1690 AN 2 Parap Stock Exchange
Parap Libertad Line B 1690 AN 4 Parap Libertad Train Station
Quri Wasa 1718 AN 2 Gold House Temple
Wechua Avenue 1690 AN 2 Wechua Nation
Atfael Line C 1690 AN 4 Atfael barrio
Ibicife 1708 AN 2 Ibicife barrio
Hata 1690 AN 2 Thani Choque Hata, biologist
Estadio 1690 AN 2 City Stadium
Plaza de Armas 1690 AN 2 City Arsenal
Pamache 1708 AN 2 Pamache barrio
Ciudadela 1690 AN 2 City Citadel
Colina de la Empresa 1690 AN 3 Company Hill
Tecnópolis 1718 AN 2 Technology Town
Centro Corporativo 1718 AN 2 Corporate Center Tower
Plaza Mercantil 1718 AN 3 Merchant's Plaza
Trinicioho 1704 AN 2 Qhispisisa Quispe Trinicioho, politician
Penbuco 1704 AN 2 Penbuco barrio
Juasíla 1704 AN 3 Juasíla barrio
Curatella 1718 AN 2 Curatella barrio
Hilachija 1718 AN 3 Hilachija barrio

Line B

Line B runs west to east, connecting the Parap International Airport to the Central Station, as well as the city center. Connects to Line A at the Central Station. It is identified by the colour Red.

The Line was approved with Line A in 1686 AN. It was finished 2 months after A. It was opened between Hualvilca and Vallelos 1690 AN. The line runs underground up to San Juan in the west, and Vallelos to the east. The extension to the Airport opened in 1694 AN. The extension to Merquel followed in 1704 AN. As part of the 'Nueva Decáda' program, the extension to Merquel Este and T2 opened in 1718 AN. The line is used by tourists extensively, as the direct link between the airport and central station.

Name Connections Date opened Platforms Namesake
Terminal 2 1718 AN 3 Airport Terminal 2
Aeropuerto 1694 AN 3 Parap International Airport
P+R Cardolatí 1694 AN 2 Cardolatí barrio, Park & Ride
Cardolatí Centrale 1694 AN 2 Cardolatí barrio
San Juan 1694 AN 2 San Juan Cathedral
Hualvilca 1690 AN 3 Hualvilca barrio
Limcia 1690 AN 2 Limcia barrio
Dolova 1690 AN 2 Atau Hualla Dolova, historian
Qieda 1690 AN 2 Qieda barrio
Ypawa 1690 AN 2 Ypawa barrio
Caaputora 1690 AN 2 Caaputora barrio
Patuy 1690 AN 2 Patuy barrio
Plaza Paloma 1690 AN 2 Dove Square
Plaza Corazón 1718 AN 2 Heart Square
Zoo Line C 1718 AN 4 City Zoo
Puerta Dorada 1690 AN 2 Golden Gate
Plaza Réal 1690 AN 2 Royal Square & Palace
Parap Libertad Line A 1690 AN 2 Parap Libertad Train Station
Teatro 1690 AN 2 City Theater
Hospital 1690 AN 2 City Hospital
Buital 1690 AN 2 Buital barrio
Parque Ciudad Line C 1690 AN 2 City Park
Vallelos 1690 AN 3 Qorisia Yacupaico Vallelos, politician
Virembó 1704 AN 2 Virembó barrio
Merquel 1704 AN 3 Merquel barrio
Merquel Este 1718 AN 3 Merquel barrio, east end

Line C

Line C is the city circular line, connecting the central conurbation to the city center and bypassing Parap Libertad station.It connects to both Line A and B twice, and has a small branch in the northeast. It is identified by the colour green.

The Line was the key project in the 'Nueva Decáda' program, started in 1715 AN. Its tunelling took more than 3 years, and was opened in 1718 AN. The line runs entirely underground. The line is popular with commuters, as well as a relief line for connecting at Parap Libertad, which was getting overcrowded by 1712 AN.

Name Connections Date opened Platforms Namesake
Quilcayán 1718 AN 3 Quilcayán barrio
Sanquillo 1718 AN 2 Sanquillo neighborhood, Quilcayán
Wamanwasi 1718 AN 3 Wamanwasi neighborhood, Atfael
Brisaviva 1718 AN 2 Brisaviva neighborhood, Atfael
Atfael Line A 1718 AN 2 Atfael barrio
Almendros 1718 AN 2 Almond Trees Park
Marisma Azul 1718 AN 2 Blue Marshlands neighborhood, Kkisukuy Illaqta
Mirador del Sol 1718 AN 2 Sun Viewpoint Theater
Pachamama 1718 AN 2 Mother Earth park
Zoo Line B 1718 AN 2 City Zoo
Robledal 1718 AN 2 Oak Trees neighborhood, Illaqta Ukhupi
Uyu 1718 AN 2 Uyu neighborhood, Illaqta Ukhupi
Plaza del Sol Line A 1718 AN 2 Sun Square
Verdesol 1718 AN 2 Verdesol neighborhood, Illaqta Ukhupi
Almalinda 1718 AN 2 Almalinda neighborhood, Illaqta Ukhupi
Tikanayra 1718 AN 2 Tikanayra neighborhood, Illaqta Ukhupi
Llank'aylla 1718 AN 2 Llank'aylla neighborhood, Buital
Parque Ciudad Line B 1718 AN 2 City Park
Yanantin 1718 AN 2 Yanantin neighborhood, Buital
Pachamaki 1718 AN 3 Pachamaki neighborhood, Quilcayán

Stations

Most stations are served 24 hours a day. Underground stations in Cárdenas are typically accessed by staircases going down from street level. Many of these staircases are painted in red, with slight or significant variations in design for each station. Several stations are built underneath other buildings and have accesses inside or adjacent to it. All entrances have yellow square lights and signs with 'Metro'.

Concourse

Most stations in the subway system have mezzanines. Mezzanines allow for passengers to enter from multiple locations at an intersection and proceed to the correct platform without having to cross the street before entering. Inside mezzanines are fare control areas, where passengers physically pay their fare to enter the subway system. Many elevated stations also have platform-level fare control with no common station house between directions of service.

Paying for subway services can be done in station booths or vending machines. There is a physical ticket system, as well as a digital contactless smart card known as TarjetaMetro. These smart cards can be swiped at a turnstile, customers enter the fare-controlled area of the station and continue to the platforms. Special 'Waiting Areas' are available in most underground stations, consisting of benches and identified by a yellow sign.

Platforms

A typical subway station has waiting platforms ranging from 150 to 180 m (450 to 600 ft). Some are longer. Most stations have platforms serving one line, but some share lines. Overhead electronic boards show which trains stop where and when. Identification is also available on the front and sides of the trains.

There are several common platform configurations. Most single line stations, especially above ground, have two side platforms. Double and multi-line stations have at least one island platform. End stations also have an island platform.

Accesibility

The network was built with facilities for Disabled people in mind. Most are handicapped-accessible, including wheelchair-friendly turnstiles. Street elevators are available for many stations. Many stations also have both staircases and escalators.

Service

Fares

Riders pay a single fare to enter the subway system and may transfer between trains at no extra cost until they exit via station turnstiles; the fare is a flat rate regardless of how far or how long the rider travels. Thus, riders must swipe their physical ticket, TarjetaMetro, or smartphone on an reader at the turnstile upon entering the subway system, but not a second time upon leaving.

As of 1716 AN, the base fare is NAX€2.25 with the last fare increase occuring on II.1715 AN. Fares can be paid with most credit or debit cards (including smartphone pay), with a reusable TarjetaMetro, or with single-use tickets. The PMRC offers 7-day (at €14.50) and 30-day (at €60.00) unlimited ride programs that can lower the effective per-ride fare significantly. Reduced fares are available for the elderly and people with disabilities (at €1.65).

Operating hours

Service starts at 5:30 am and ends at about 12:00 pm. On Fridays and Saturdays, services end later, at about 1:30 pm.

When the Metro is closed, two night train services are run at 2:00 and 4:00 pm, except on Fridays and Saturdays, when a single night service is run at 4:00 pm. It follows the same routes and stops at the same stations.

Wi-fi

Following the Cárdenas Metro, Wi-fi was installed on the PMR in 1710 AN for most stations and trains. It is a free service. The network is connected through 4G services, including within tunnels.

Safety and Security

Signaling

Most routes use block signalling, but several routes have been retrofitted with communication-based train control, which would allow trains to run without conductor input.

Wayside block signaling

Much of the system currently uses automatic block signaling with fixed wayside signals and automatic train stops to provide safe train operation across the whole system. These signals work by preventing trains from entering a "block" occupied by another train. Typically, the blocks are 300 m (1,000 ft) long. Red and green lights show whether a block is occupied or vacant. The train's maximum speed will depend on how many blocks are open in front of it. The signals do not register a train's speed, nor where in the block the train is located.

Subway trains are stopped mechanically at all signals showing "stop". To make train stops safe and effective, wayside trippers must not be moved to trip ("stop") position until the train has fully passed.

Communications-based train control

Following the FDTA in Cárdenas, the PMRC has started installing CBTC, which supplements rather than replaces the fixed-block signal system; it allows trains to operate more closely together with lower headways. Due to the success of the system, additional cars were ordered to service the system. Lines A and B were the first to be outfitted with this. Lines G, H, and I were built with CBTC in mind. The PMRC has operated it in conjunction with OPTO since 1715 AN. It has done all this in combination with the system known as the Automatic Metro Supervision (AMS). AMS allows dispatchers in the Operations Control Center (OCC) to see where trains are in real time, and whether each individual train is running early or late. Dispatchers can hold trains for connections, re-route trains, or short-turn trains to provide better service when a disruption causes delays.

See also