This is an article related to Nouvelle Alexandrie. Click here for more information.

Punta Santiago Metro

From MicrasWiki
Jump to navigationJump to search
Punta Santiago Metro
Santiago Central Metro.jpg
Santiago Central Metro Station
Native name Metro de Punta Santiago
Owner Punta Santiago Transport Authority
Locale Punta Santiago
Transit type Rapid transpit
Number of lines 3
Number of stations 54
Daily ridership 243,836 (1718 AN)
Annual ridership 89 million (1718 AN)
Began operation 1700 AN
Operator Punta Santiago Transport Authority
Headway 8 minutes
Number of vehicles 24 (active)
10 (reserve)
System length 40.7 km (25.4 mi)
Track gauge 1435 mm (4 ft 8 1⁄2 in)
Average speed 64 km/h (40 mph)
Top speed 140 km/h (87 mph)
Punta Santiago metro new.png

The Punta Santiago Metro is a rapid transit railway network that serves the city of Punta Santiago, the capital of Alduria. The Metro was opened in 1700 AN, consisting of two lines. Since then, two more lines have been added to the network. It has a total of 87 stations, and a total length of 45 km. It is currently the only metro network in Alduria, taking more than 200,000 passengers each day. It is highly interconnected between lines.

Since the opening of the network, the the TR-100 has been the only vehicle on the network.

Rolling stock

Designation Producer Total Units Units in service Power output Top speed Years built Image
TR-100 'Super-Subway' TR 64 54 2600 kW 140 km/h (87 mph) 1700-1710 AN TR-100 'Super-Subway'.jpg

History

Plan for the Metro (1692-1700)

The origins of the Punta Santiago Metro lay in the completion of the second wave plan of the Cárdenas Metro. Around the same time as the formulation of the North-South Connection Plan in the aforementioned city, Punta Santiago formulated the construction of multiple orbital lines that would connect at Jingtown and the Central Station, and serve the east barrios. In the end draft, two lines were approved:

  • The Blue Line would go south from Jingtown, connecting the Port and the city center to the central station, and onwards to the north-east suburbs.
  • The Red Line would go east from Jingtown, serving the University and Campos Business District, running to the central station, and onwards to the south-east suburbs.

The lines were completed in 1700 AN saw the Punta Santiago Transport Authority take ownership of the network, with higher then expected ridership in the first years.

City Connector Project (1700-1715)

The second step for the metro was a connection to Akcazaba, as well as services to the stadium and the south suburbs. A new plan, the 'City Connector', was devised in 1700 AN, calling for the creation of the Green Line to run through the city centre, starting at the University and connecting to the city stadium, onwards to the south suburbs. Construction started in 1702 AN, with specialised deep boring machines to travel underneath the Citadel and Akcazaba. The line opened in 1705 AN.

Several improvements were made in collaboration with the City Connector Project. These included the Airport extension that was opened in two stages, to Ordoz P+R in 1706 AN, and the airport itself in 1712 AN. Several infill stations opened in 1706 AN as well. The Roncudio, Ascaso and Gondiche Spurs were important extensions that connected vital suburbs in the south, north and east, and were opened in 1715 AN.

Metro Vision 1720 (1715-1720)

The minor spurs of the network that opened in 1715 AN were a prelude to a major expansion plan for the next decade: the Metro Vision 1720 Plan that was published that year. It called for extensions of all existing lines, as well as a new Yellow Line; commonly known as the Sea to Airport Link. It started at Puerto, running eastward to central station, southeast along the Red Line, and serving major developments in Colorado and Santurce Barrios, before connecting to the Airport. A large petition by Lake Sanhueza Resort, only 4 km east from the airport, secured another eastern extension.

Construction took a long time to tunnel underneath the city centre and the dense urbanisation in Colorado and Santurce. The Yellow Line was opened, with a delay, in 1721 AN.

The first part of the project to open was the Gozutempe extension, opening in 1716 AN. The Red and Blue Lines reached their connector station at Shang Lou in 1719 AN. The extensions of the Roncudio, Ascaso, and Gondiche Spurs, now renamed as Branch Lines, opened together with the Yellow Line in 1721 AN. Multiple infill stations also opened. The project managed to double the number of stations in the network.

Consolidation (1720-)

After the completion of MV1720, the Metro was consolidated by the increasing of capacity on rolling stock and lower headways. The Gondiche and Ascaso Branches were integrated into the new Line E in 1726 AN, following the opening of the new North-East Connection underneath Estacíon Central. The line also extended to Fuerte Canal.

The major project was the so-called Station-to-Stadium Line that broke ground in 1721 AN and was finished in 1726 AN, opening a month later. It took over the Santurce Branch from Line C, and served both the Parliament Palace and the Executive Mansion.

Lines

# Line Opened Last extension Stations Served Service Pattern Length Average interstation Journeys made (1726 AN) Termini Rolling Stock Conduction system
1 Line A 1700 AN 1721 AN 23 12 tph 12.3 km / 7.7 mi 650 m / 2,130 ft 268.5 million Shang Lou

Barbero

TR-100 Automatic
2 Line B 1700 AN 1721 AN 22 12 tph 16.8 km / 10.5 mi 870 m / 2,850 ft 289.2 million Shang Lou

Teixidó

TR-100 Automatic
3 Line C 1705 AN 1721 AN 23 8 tph 11.6 km / 7.2 mi 630 m / 2,060 ft 215.5 million Universitad Réal

Verdugo

TR-100 Automatic
4 Line D 1721 AN 1721 AN 17 6 tph 14.3 km / 8.9 mi 620 m / 2,030 ft 91.8 million Puerto

Lago Sanhueza

TR-100 Automatic
5 Line E 1726 AN 1726 AN 20 8 tph 19.4 km / 12.1 mi 620 m / 2,030 ft 14.2 million Fuerte Canal

Marinero

TR-100 Automatic
6 Line F 1726 AN 1726 AN 20 8 tph 15.7 km / 9.8 mi 650 m / 2,130 ft 6.4 million Exposición

Bosque de Ninfa

TR-100 Automatic

Stations

Line A

Line A services most of the the city center, as well as connecting to Jingtown and the Central Station. It starts at the interchange with Line B, then runs east and then north , crossing line C and then Line B at the Central Station. It is identified by the colour Blue.

The Line was approved, along with Line B, in 1696 AN. Construction took 4 years, and needed bored tunnels. Beyond Colegio Inti, the line runs above ground. The line opened in 1700 AN. Additional infill stations opened in 1706 AN and in 1721 AN due to growing demand. The connection is especially crowded between Ayuntamiento and Estacion Central. In 1716 AN, the extension to Gozutempe opened, which was extended to Shang Lou in 1721 AN. In 1715 AN, the Roncudio Spur was opened with four new stations, which was extended to Barbero with three stations in 1721 AN. The Sabalan main line was also extended that year to Marinero. University station was renamed to Royal University station to distinguish with the Jingtown University.

Name Connections Date opened Platforms Namesake
Shang Lou Line B 1719 AN 6 Shang Lou, Jing politician
Zaofu 1719 AN 2 Zaofu neighbourhood, Jingtown
Gozutempe 1716 AN 3 Gozutempe neighbourhood, Jingtown
Jingtown Line B 1700 AN 6 Jingtown barrio
Puerto Line D 1700 AN 5 Port of Punta Santiago
Muelle Real 1721 AN 2 Royal Quays neighbourhood, Port
Costa Azul 1700 AN 2 Costa Azul barrio
Eilat 1700 AN 2 Eilat barrio
Quebrada 1700 AN 2 Quebrada barrio
Hospital Alexandria 1706 AN 2 Alexandria Central Hospital
Place d'Etoile 1700 AN 2 Star Square
Sacre Coeur 1700 AN 2 Holy Heart Cathedral
Ayuntamiento Line C 1700 AN 4 Town Hall
Teatro Ciudad 1706 AN 2 City Theater
Estacion Central Line B

Line D Line E Line F

1700 AN 10 Punta Santiago Central Station
Fornatil Line E 1721 AN 4 Fornatil neighbourhood, Ballester
Ballester Line E 1700 AN 4 Ballester barrio
Exposición Line E

Line F

1700 AN 5 Exposition Centre
Carliati 1715 AN 3 Carliati neighbourhood, Venzuco
Venzuco 1715 AN 2 Venzuco barrio
Nozacarna 1715 AN 2 Nozacarna neighbourhood, Roncudio
Roncudio 1715 AN 3 Roncudio barrio
Sastre 1721 AN 2 Sastre neighbourhood, Roncudio
Ferrufino 1721 AN 2 Town of Ferrufino
Barbero 1721 AN 3 Barbero neighbourhood, Ferrufino

Line B

Line B runs through the west and north parts of the city, connecting to Line A and C, crossing the former twice. It is identified by the colour Red.

The Line was approved, along with Line B, in 1696 AN. The line opened three weeks after Line A. Beyond Colorado, the line runs above ground. The line opened in 1700 AN. The extension to Ordoz P+R opened in 1706 AN. Torre de Acero infill station opened in 1708 AN, and more infill stations opened in 1721 AN. It is a popular connection between the University, Campos Business District, and the Central Station. In 1712 AN, the airport extension came online, extending to the town of Teixidó in 1721 AN. In 1715 AN, the Gondiche spur opened, with three new stations, which was extended to Carnicero in 1721 AN.

Name Connections Date opened Platforms Namesake
Shang Lou Line A 1719 AN 6 Shang Lou, Jing politician
Universitad Jingdaoese 1719 AN 2 Jingtown University
Oriente 1700 AN 3 Oriente barrio
Jingtown Line A 1700 AN 6 Jingtown barrio
Catodral 1700 AN 2 Jilin Catodral
Universitad Réal Line C 1700 AN 4 Royal University of Punta Santiago
Centro de Commercio Internacional 1700 AN 2 International Trade Center
Plaza de Raspur 1700 AN 2 Raspur Square
Hospital General 1700 AN 4 Punta Santiago General Hospital
Puebla 1700 AN 2 Puebla barrio
Museo Nacional 1721 AN 2 National Museum of Punta Santiago
Estacion Central Line A

Line D

Line E

Line F

1700 AN 10 Punta Santiago Central Station
Torre de Acero Line D 1708 AN 4 Steel Tower
Mercado de Ganado Line D 1721 AN 4 Cattle Market
Plaza de la Proclamación Line D 1700 AN 4 Proclamation Square
Colorado 1700 AN 2 Colorado barrio
Niavaran 1700 AN 2 Niavaran barrio
Portiz 1721 AN 2 Portiz neighbourhood, Niavaran
Ordoz P+R 1706 AN 3 Alfonso Ordoz, politician
Charpantier 1712 AN 2 Charpantier barrio
Aeropuerto Transíto Line D 1712 AN 2 Airport Main Terminal
Terminal de Carga 1712 AN 3 Airport Cargo Terminal
Ovejero 1721 AN 2 Village of Ovejero
Teixidó 1721 AN 2 Town of Teixidó

Line C

Line C runs through most of the city center, interchanging with Line B, and then crossing Line C. It is identified by the colour Green.

Line C was approved in 1702 AN as part of the 'City Connector Project'. Construction was especially hard between the Citadel and Defensa stations. It opened in 1705 AN. It is the very popular as it passes directly through the city center. The Ascaso spur was opened in 1715 AN, with four new stations, which was extended to Verdugo in 1721 AN. The extension to Bosque de Ninga also came online that year, as did multiple infill stations.

Name Connections Date opened Platforms Namesake
Universitad Réal Line B 1705 AN 6 Royal University of Punta Santiago
Plaza de Armas 1705 AN 2 Punta Santiago Arsenal
Citadel Line D 1705 AN 4 Punta Santiago Citadel
Akcazaba 1705 AN 2 Akcazaba barrio
Ayuntamiento Line C 1705 AN 4 Town Hall
Defensa 1705 AN 2 Defense department
Estadio 1705 AN 2 Punta Santiago Stadium
Piscina Ciudad 1721 AN 2 City Swimming Pool
Cuéllar 1705 AN 2 María Cuéllar, singer
Yáñez 1721 AN 3 Barbara Yáñez, biologist
Omella 1715 AN 3 Omella barrio
San Pedro 1715 AN 2 San Pedro Cathedral
Cornucopia 1715 AN 2 Cornucopia Market Hall
Ascaso 1715 AN 3 Ascaso barrio
Malafides 1721 AN 2 Enrico Malafides, painter
Verdugo 1721 AN 3 Village of Verdugo

Line D

Line D runs through the city centre and connects to every other line, running alongside Line B for a short stretch. It is identified by the colour Yellow.

Line D was the main part of the so-called 'Metro Vision 1720', which called for several major extensions. It allowed for a direct connection between the Airport and Harbour, two major transit hubs. It opened, with delays due to construction underneath Citadel station, in 1721 AN. It serves several major destinations including the popular tourist destination at Lake Sanhueza.

Name Connections Date opened Platforms Namesake
Puerto Line A 1721 AN 5 Port of Punta Santiago
Plaza Fundatores 1721 AN 2 Founders' Square
Citadel Line C 1721 AN 4 Punta Santiago Citadel
Plaza Viejo 1721 AN 2 Old City Square
Estacíon Central 1721 AN 10 Punta Santiago Central Station
Torre de Acero Line B 1721 AN 4 Steel Tower
Mercado de Ganado Line B 1721 AN 4 Cattle Market
Plaza de la Proclamación Line B 1721 AN 4 Proclamation Square
Morzuda 1721 AN 2 Morzuda neighbourhood, Colorado
Plaza del Sol 1721 AN 2 Sun Square
Fonz 1721 AN 2 Henri Fonz, writer
Zoo 1721 AN 2 City Zoo
Castillo Cubero 1721 AN 2 Cubero Castle
Obrero 1721 AN 2 Gabriela Obrero, singer
Aeropuerto Transíto Line B 1721 AN 4 Airport Main Terminal
Terminal 2 1721 AN 2 Airport Terminal 2
Lago Sanhueza 1721 AN 3 Lake Sanhueza national park

Line E

Line E runs through the Gondiche and Ascaso branches, sharing services with lines A and B in the city centre. It is identified by the colour Dark Grey.

Line E took over the branches of Lines A and B to expand the services to these parts of Punta Santiago. It connects the Northern Suburbs together, as well as connecting to the train station. It opened in 1726 AN.

Name Connections Date opened Platforms Namesake
Marinero 1721 AN 3 Alfonso Marinero, composer
Fraile 1721 AN 2 Fraile Neighbourhood, Sabalan
Sabalan 1700 AN 3 Sabalan barrio
Corozal 1700 AN 2 Corozal barrio
Qanavat 1700 AN 2 Qanavat barrio
Colegio Inti 1700 AN 2 College of Inti
Exposición Line A

Line F

1700 AN 5 Exposition Centre
Ballester Line A 1700 AN 3 Ballester barrio
Fornatil Line A 1721 AN 3 Fornatil neighbourhood, Ballester
Estacion Central Line A

Line B

Line D

Line F

1700 AN 10 Punta Santiago Central Station
Museo Nacional Line B 1721 AN 3 National Museum of Punta Santiago
Puebla Line B 1700 AN 3 Puebla barrio
Menosero 1715 AN 3 Menosero neighbourhood, Gondiche
Plaza Cármen 1721 AN 2 Carmen Square
Rumdum 1715 AN 2 Rumdum Square
Gondiche 1715 AN 3 Gondiche barrio
Ascaso 1721 AN 2 Ascaso neighbourhood, Gondiche
Carnicero 1721 AN 3 Enrico Canricero, singer
Posalqud 1726 AN 2 Posalqud town
Fuerte Canal 1726 AN 3 Fuerte Canal town

Line F

Line F runs through most of the city centre, and took over the Santurce branch from Line C. It is identified by the colour Pink

Line F was part of the so-called 'Station to Stadium' Project, improving connections between the train station and the stadium, and beyond. It also serves important locations such as the Parliament and the Executive Mansion.

Name Connections Date opened Platforms Namesake
Exposición Line A

Line E

1700 AN 5 Exposition Centre
Parque de Ciencia 1726 AN 2 Science Park
Palacio del Rey 1726 AN 2 Royal Palace of Alduria
Plaza de la Proclamación 1726 AN 2 Proclamation of Punta Santiago
Parlamento 1726 AN 2 Parliament of Alduria
Estacíon Central Line A

Line B

Line D

Line E

1700 AN 10 Punta Santiago Central Station
Ejecutiva 1726 AN 2 Executive Mansion of Alduria
Estadio Line D 1705 AN 2 Punta Santiago Stadium
Piscina Ciudad Line D 1721 AN 2 City Swimming Pool
Yáñez Line D 1721 AN 3 Barbara Yáñez, biologist
Cuéllar 1705 AN 2 María Cuéllar, singer
Plaza Pared 1705 AN 2 Wall Square
Froñore 1721 AN 2 Froñore nieghbourhood, Santurce
Santurce 1705 AN 2 Santurce barrio
Monacillo 1705 AN 2 Monacillo barrio
Alhambra 1705 AN 2 Alhambra barrio
Beauregard 1705 AN 3 Beauregard barrio
Bosque de Ninfa 1721 AN 3 Nymph Forest national park

Stations

All 101 stations are served 24 hours a day. Underground stations are typically accessed by staircases going down from street level. Many of these staircases are painted in blue, with slight or significant variations in design for each station. Several stations are built underneath other buildings and have accesses inside or adjacent to it. All entrances have yellow square lights and signs with 'Underground'.

Concourse

Most stations in the subway system have mezzanines. Mezzanines allow for passengers to enter from multiple locations at an intersection and proceed to the correct platform without having to cross the street before entering. Inside mezzanines are fare control areas, where passengers physically pay their fare to enter the subway system. Many elevated stations also have platform-level fare control with no common station house between directions of service.

Paying for subway services can be done in station booths or vending machines. There is a physical ticket system, as well as a digital contactless smart card known as TarjetaMetro. These smart cards can be swiped at a turnstile, customers enter the fare-controlled area of the station and continue to the platforms. Special 'Waiting Areas' are available in most underground stations, consisting of benches and identified by a yellow sign.

Platforms

A typical subway station has waiting platforms ranging from 150 to 180 m (450 to 600 ft). Some are longer. Most stations have platforms serving one line, but some share lines. Overhead electronic boards show which trains stop where and when. Identification is also available on the front and sides of the trains.

There are several common platform configurations. Most single line stations, especially above ground, have two side platforms. Double and multi-line stations have at least one island platform. End stations also have an island platform.

Accesibility

The network was built with facilities for Disabled people in mind. Most are handicapped-accessible, including wheelchair-friendly turnstiles. Street elevators are available for many stations. Many stations also have both staircases and escalators.

Service

Fares

Riders pay a single fare to enter the subway system and may transfer between trains at no extra cost until they exit via station turnstiles; the fare is a flat rate regardless of how far or how long the rider travels. Thus, riders must swipe their physical ticket, TarjetaMetro, or smartphone on an reader at the turnstile upon entering the subway system, but not a second time upon leaving.

As of 1718 AN, the base fare is NAX€2,75 with the last fare increase occuring on II.1712 AN. Fares can be paid with most credit or debit cards (including smartphone pay), with a reusable TarjetaMetro, or with single-use tickets. The PSTA offers 7-day (at €11.00) and 30-day (at €45) unlimited ride programs that can lower the effective per-ride fare significantly. Reduced fares are available for the elderly and people with disabilities.

Operating hours

Service starts at 5:30 am and ends at about 12:00 pm. On Fridays and Saturdays, services end later, at about 1:30 pm.

When the Metro is closed, two night train services are run at 2:00 and 4:00 pm, except on Fridays and Saturdays, when a single night service is run at 4:00 pm. It follows the same routes and stops at the same stations.