T-5/A-5 Tejón de Miel: Difference between revisions

From MicrasWiki
Jump to navigationJump to search
mNo edit summary
No edit summary
 
(7 intermediate revisions by 4 users not shown)
Line 33: Line 33:
|'''Maximum speed:'''|| 970 km/h
|'''Maximum speed:'''|| 970 km/h
|-
|-
|'''Range:'''|| Ferry range: 2,300 km
|'''Range:'''|| 2,300 km
|-
|-
|'''Service ceiling:'''|| 13,700 m  
|'''Service ceiling:'''|| 13,700 m  
Line 48: Line 48:


The '''{{PAGENAME}}''' is an [[Alduria-Wechua|Alduro-Wechuan]] high-wing, twin-turbojet, ground-attack aircraft developed by [[Javelin Industries]] in response to the [[Department of Defense (Alduria-Wechua)|Department of Defense's]] '''Operational Requirement 1685.102''' for a twin-engine jet aircraft to complement the turboprop [[T-4/A-4 Flecha]] in the close air support and limited air defence role.
The '''{{PAGENAME}}''' is an [[Alduria-Wechua|Alduro-Wechuan]] high-wing, twin-turbojet, ground-attack aircraft developed by [[Javelin Industries]] in response to the [[Department of Defense (Alduria-Wechua)|Department of Defense's]] '''Operational Requirement 1685.102''' for a twin-engine jet aircraft to complement the turboprop [[T-4/A-4 Flecha]] in the close air support and limited air defence role.
==Development==


Conceived and financed under the defence "pillar" of the [[New Prosperity Plan]], the Operational Requirement specified that 100% of the design, 75% of the materials (including composites), 50% of the components (including engine components), and 25% of the avionics, were to be sourced from Alduro-Wechuan industries with final assembly to take place in Alduro-Wechuan territory. Additionally the Operational Requirement mandated compatibility with [[Raspur Pact]] standard communications systems and ordnance loadouts. Following the review of expressions of interest received from the country's defence manufacturers, the decision was made by the Aerospace Directorate of the Department Defense to accept the tendered design proposal received from Javelin Industries on 18.XIV.{{AN|1685}}. The contract awarded gave Javelin Industries five years in which to deliver a working prototype for evaluation testing and a subsequent ten year period, upon acceptance, in which to fulfil a subsequent order for the manufacture of 1,568 airframes of the type.   
Conceived and financed under the defence "pillar" of the [[New Prosperity Plan]], the Operational Requirement specified that 100% of the design, 75% of the materials (including composites), 50% of the components (including engine components), and 25% of the avionics, were to be sourced from Alduro-Wechuan industries with final assembly to take place in Alduro-Wechuan territory. Additionally the Operational Requirement mandated compatibility with [[Raspur Pact]] standard communications systems and ordnance loadouts. Following the review of expressions of interest received from the country's defence manufacturers, the decision was made by the Aerospace Directorate of the Department Defense to accept the tendered design proposal received from Javelin Industries on 18.XIV.{{AN|1685}}. The contract awarded gave Javelin Industries five years in which to deliver a working prototype for evaluation testing and a subsequent ten year period, upon acceptance, in which to fulfil a subsequent order for the manufacture of 1,568 airframes of the type.   
Line 53: Line 55:
The performance specifications of Operational Requirement drove the development of the [[Javelin Industries J89 Turbojet]], upon which work began on 12.I.{{AN|1686}} after proposals for the licenced production of the [[Constancia]]n axial turbojet engine utilised in the [[T-3 Akóntio]] were rejected on account of the reputation for mechanical unreliability in the design that dated back to the [[War of the Harpy]].
The performance specifications of Operational Requirement drove the development of the [[Javelin Industries J89 Turbojet]], upon which work began on 12.I.{{AN|1686}} after proposals for the licenced production of the [[Constancia]]n axial turbojet engine utilised in the [[T-3 Akóntio]] were rejected on account of the reputation for mechanical unreliability in the design that dated back to the [[War of the Harpy]].


==Orders==
==Design==
 
==Operational history==
 
===Orders===


*{{team flag|Alduria-Wechua|name=Military of Alduria-Wechua}} – 1,568 ({{AN|1685}}, due by {{AN|1696}})
*{{team flag|Nouvelle Alexandrie|name=Federal Forces of Nouvelle Alexandrie}} – 1,528 ({{AN|1685}}, due by {{AN|1696}})
*{{team flag|Constancia|name=Imperial Constancian Air Force}} – 100, with initial option for additional 100 ({{AN|1685}}, due by {{AN|1696-1697}})
*{{team flag|Sanama|name=Sanaman Air Force}} – 105 ({{AN|1691}})  
*{{team flag|Sanama|name=Sanaman Air Force}} – 105 ({{AN|1691}})  
 
*{{team flag|Sanama|name=Sanaman Navy}} – 8 ({{AN|1694}}) Evaluation for possible carrier-based close air support role
[[Category:Aircraft]][[Category:Alduria-Wechua]]
*{{team flag|Elluenuueq|name=Union Defence Force}} – 40 ({{AN|1695}})
[[Category:Military aviation]][[Category:Nouvelle Alexandrie]][[Category:Constancia]][[Category:Sanama]][[Category:Elluenuueq]]
[[Category:Military of Nouvelle Alexandrie]]
[[Category:Javelin Industries]]

Latest revision as of 20:32, 7 March 2023

T-5/A-5 Tejón de Miel
Javelin T-5-A-5 Tejón de Miel.png
Type: Jet trainer / close air support
Designer: Javelin Industries
Manufacturer: Javelin Industries
Development: 1686 AN1691 AN
In service: 1692 AN (anticipated)
Operators:
Crew: Two
Length: 10.8 m
Wingspan: 9.5 m
Height: 2.7 m
Empty weight: 2,849 kg
Take-off weight: 4,635 kg
Powerplant: 2x Javelin Industries J89 Turbojet, 2,850 lbf of dry thrust each
Maximum speed: 970 km/h
Range: 2,300 km
Service ceiling: 13,700 m
Armament: 6 hardpoints (RP standard: AAMs, ASMs, gun pods, bombs, rockets)
Unit cost:
Status: Development / Initial Production


The T-5/A-5 Tejón de Miel is an Alduro-Wechuan high-wing, twin-turbojet, ground-attack aircraft developed by Javelin Industries in response to the Department of Defense's Operational Requirement 1685.102 for a twin-engine jet aircraft to complement the turboprop T-4/A-4 Flecha in the close air support and limited air defence role.

Development

Conceived and financed under the defence "pillar" of the New Prosperity Plan, the Operational Requirement specified that 100% of the design, 75% of the materials (including composites), 50% of the components (including engine components), and 25% of the avionics, were to be sourced from Alduro-Wechuan industries with final assembly to take place in Alduro-Wechuan territory. Additionally the Operational Requirement mandated compatibility with Raspur Pact standard communications systems and ordnance loadouts. Following the review of expressions of interest received from the country's defence manufacturers, the decision was made by the Aerospace Directorate of the Department Defense to accept the tendered design proposal received from Javelin Industries on 18.XIV.1685 AN. The contract awarded gave Javelin Industries five years in which to deliver a working prototype for evaluation testing and a subsequent ten year period, upon acceptance, in which to fulfil a subsequent order for the manufacture of 1,568 airframes of the type.

The performance specifications of Operational Requirement drove the development of the Javelin Industries J89 Turbojet, upon which work began on 12.I.1686 AN after proposals for the licenced production of the Constancian axial turbojet engine utilised in the T-3 Akóntio were rejected on account of the reputation for mechanical unreliability in the design that dated back to the War of the Harpy.

Design

Operational history

Orders