South Benacian Pipeline: Difference between revisions
From MicrasWiki
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
The '''{{PAGENAME}}''' is a crude oil pipeline in southern [[Benacia]]. It is owned and operated by [[SanOil]], the public oil company in [[Sanama]]. Its original extent was from the oilfields of [[Amarra]] to the capital [[Niyi]] and then on to [[Port Niyi]] at the coast. After treaties were signed with the [[UGB]] and [[Tellia]], it was extended towards the northwest. The extension was completed in 1674. The line passes through Tellia, bypasses [[Merensk]] and terminates at [[Rothaven]]. | The '''{{PAGENAME}}''' is a crude oil pipeline in southern [[Benacia]]. It is owned and operated by [[SanOil]], the public oil company in [[Sanama]]. Its original extent was from the oilfields of [[Amarra]] to the then-capital [[Niyi]] and then on to [[Port Niyi]] at the coast. After treaties were signed with the [[UGB]] and [[Tellia]], it was extended towards the northwest. The extension was completed in 1674. The line passes through Tellia, bypasses [[Merensk]] and terminates at [[Rothaven]]. | ||
[[Category:Sanama]] | [[Category:Sanama]] | ||
[[Category:Unified Governorates of Benacia]] | [[Category:Unified Governorates of Benacia]] | ||
[[Category:Tellia]] | [[Category:Tellia]] | ||
Revision as of 08:46, 6 April 2020
The South Benacian Pipeline is a crude oil pipeline in southern Benacia. It is owned and operated by SanOil, the public oil company in Sanama. Its original extent was from the oilfields of Amarra to the then-capital Niyi and then on to Port Niyi at the coast. After treaties were signed with the UGB and Tellia, it was extended towards the northwest. The extension was completed in 1674. The line passes through Tellia, bypasses Merensk and terminates at Rothaven.