MN-2 Manda: Difference between revisions
From MicrasWiki
Jump to navigationJump to search
mNo edit summary |
mNo edit summary |
||
Line 22: | Line 22: | ||
|'''Building:'''||4 | |'''Building:'''||4 | ||
|- | |- | ||
|'''Completed:'''|| | |'''Completed:'''||3 | ||
|- | |- | ||
|'''Commissioned:''' || 3 | |'''Commissioned:''' || 3 | ||
Line 33: | Line 33: | ||
|'''Designed:''' || 1692 – 1698 AN | |'''Designed:''' || 1692 – 1698 AN | ||
|- | |- | ||
|'''Manufacturer:''' || {{team flag|Shireroth}} [[Musica Naval Arsenal]] | |'''Manufacturer:''' || {{team flag|Shireroth}} · [[Musica Naval Arsenal]] | ||
|- | |- | ||
| align=center colspan=2 | | | align=center colspan=2 | | ||
Line 64: | Line 64: | ||
|- | |- | ||
| style="vertical-align: top;" | '''Armament:''' | | style="vertical-align: top;" | '''Armament:''' | ||
| {{unbulleted list|4 × 533 mm torpedo tubes (15 torpedoes)|2 Vertical Multi-Purpose Locks for 6 missiles|1 Forward Multi-Purpose Lock}} | | {{unbulleted list|4 × 533 mm torpedo tubes (15 torpedoes)|2 Vertical Multi-Purpose Locks for 6 missiles each|1 Forward Multi-Purpose Lock}} | ||
|- | |- | ||
| align=center colspan=2 | | | align=center colspan=2 | | ||
|} | |} | ||
The '''{{PAGENAME}}''' is a diesel-electric submarine produced at the [[Musica Naval Arsenal]], with technology provided by study of naval assets inherited from [[Drak-Modan]], Setec Kezan Ltd, and maintenance of Shireroth's remaining [[shire:Poltroon Class Submarine]]. First contracted in 1692 AN, the lead ship, IRS Manda, was commissioned on 5.III.1698 AN. A lengthy shakedown cruise led to revisions of the design and improved quality control before the Imperial Commission for Defence ordered an initial run of eight ships, with the intention to order more in order to replace the Shirerithian Navy's aging fleet. | The '''{{PAGENAME}}''' is a diesel-electric submarine produced at the [[Musica Naval Arsenal]], with technology provided by study of naval assets inherited from [[Drak-Modan]], Setec Kezan Ltd, and maintenance of Shireroth's remaining [[shire:Poltroon Class Submarine]]. First contracted in 1692 AN, the lead ship, IRS Manda, was commissioned on 5.III.1698 AN. A lengthy shakedown cruise led to revisions of the design and improved quality control before the Imperial Commission for Defence ordered an initial run of eight ships, with the intention to order more, pending satisfaction of performance in the fleet, in order to replace the Shirerithian Navy's aging fleet. | ||
==Features== | ==Features== | ||
==Units== | ==Units== | ||
{| class=wikitable | |||
|- | |||
! Name | |||
! Hull Number | |||
! Ordered | |||
! Laid Down | |||
! Commissioned | |||
|- | |||
| IRS Manda | |||
| U-201 | |||
| 1692 | |||
| 1696 | |||
| 1698 | |||
|- | |||
| IRS Anguirus | |||
| U-202 | |||
| rowspan=7 | 1700 | |||
| VI.1701 | |||
| 20.I.1703 | |||
|- | |||
| IRS Gorgo | |||
| U-203 | |||
| XIV.1701 | |||
| 8.VIII.1703 | |||
|- | |||
| | |||
| U-204 | |||
| VII.1702 | |||
| | |||
|- | |||
| | |||
| U-205 | |||
| XV.1702 | |||
| | |||
|- | |||
| | |||
| U-206 | |||
| VIII.1702 | |||
| | |||
|- | |||
| | |||
| U-207 | |||
| I.1703 | |||
| | |||
|- | |||
| | |||
| U-208 | |||
| ''IX.1703'' | |||
| | |||
|} | |||
[[category:Military]][[category:Weaponry]][[category:Submarines]] | [[category:Military]][[category:Weaponry]][[category:Submarines]] |
Revision as of 22:06, 16 December 2021
Type: | Submarine |
Place of origin: | Shireroth |
| |
In service: | 1698 – |
Used by: | Shireroth |
Planned | 8 |
Building: | 4 |
Completed: | 3 |
Commissioned: | 3 |
Retired: | |
| |
Designed: | 1692 – 1698 AN |
Manufacturer: | Shireroth · Musica Naval Arsenal |
| |
Displacement: | 3,000 tonnes |
Length: | 80 m |
Beam: | 6.4 m |
Draft: | 6 m |
Decks: | 2 |
| |
Propulsion: |
|
Range: | 18,500 km at 10 kts |
Speed: | +20 kts (37 km/h) |
Complement: | 32 |
Endurance: | 50 days |
Armament: |
|
The MN-2 Manda is a diesel-electric submarine produced at the Musica Naval Arsenal, with technology provided by study of naval assets inherited from Drak-Modan, Setec Kezan Ltd, and maintenance of Shireroth's remaining shire:Poltroon Class Submarine. First contracted in 1692 AN, the lead ship, IRS Manda, was commissioned on 5.III.1698 AN. A lengthy shakedown cruise led to revisions of the design and improved quality control before the Imperial Commission for Defence ordered an initial run of eight ships, with the intention to order more, pending satisfaction of performance in the fleet, in order to replace the Shirerithian Navy's aging fleet.
Features
Units
Name | Hull Number | Ordered | Laid Down | Commissioned |
---|---|---|---|---|
IRS Manda | U-201 | 1692 | 1696 | 1698 |
IRS Anguirus | U-202 | 1700 | VI.1701 | 20.I.1703 |
IRS Gorgo | U-203 | XIV.1701 | 8.VIII.1703 | |
U-204 | VII.1702 | |||
U-205 | XV.1702 | |||
U-206 | VIII.1702 | |||
U-207 | I.1703 | |||
U-208 | IX.1703 |