Template:Infobox infrastructure project
From MicrasWiki
Jump to navigationJump to search
Documentation
This infobox summarizes key details for infrastructure projects such as canals, aqueducts, bridges, tunnels, railways, roads, dams, and similar large-scale construction.
Usage
Copy and paste the following code at the top of the article. Fill in the fields that apply to your project and leave others blank.
{{Infobox infrastructure project
| name =
| native_name =
| native_name_lang =
| image =
| image_size =
| image_caption =
| location =
| coordinates =
| type =
| status =
| groundbreaking =
| construction_began =
| opening =
| closed =
| cost =
| owner =
| operator =
| architect =
| engineer =
| contractor =
| length =
| width =
| height =
| depth =
| elevation_change =
| capacity =
| tunnels =
| aqueducts =
| bridges =
| locks =
| stations =
| crosses =
| connects =
| materials =
| design_lifespan =
| heritage_status =
| website =
}}
Example
| Grand Système d'Aqueduc Euran (Alexandrian) | |
| Location |
|
|---|---|
| Type | Water transfer infrastructure |
| Status | Under construction (Phase I) |
| Groundbreaking | 1748 AN |
| Opening |
Phase I: 1768 (projected) Full completion: 1920 (projected) |
| Cost | OPM 180–250 billion (total, phased) |
| Owner | Government of Oportia |
| Operator | Federal Water Authority of Oportia |
| Engineer | Oportian National Engineering Corps |
| Length | 1,200 km (planned) |
| Tunnels | 14 (planned) |
| Aqueducts | 23 (planned) |
| Design lifespan | 500 years |
Parameters
- name
- Project name (defaults to page title if blank).
- native_name
- Name in original or local language.
- native_name_lang
- Language of the native name.
- image
- Image filename (without
File:prefix). - image_size
- Image width. Default is 250px.
- image_caption
- Caption displayed below the image.
- location
- Geographic location of the project.
- coordinates
- Geographic coordinates.
- type
- Type of infrastructure (canal, bridge, railway, dam, etc.).
- status
- Current status (proposed, under construction, operational, closed, etc.).
- groundbreaking
- Date of groundbreaking ceremony.
- construction_began
- Date construction started.
- opening
- Date opened or projected opening date.
- closed
- Date closed or decommissioned (if applicable).
- cost
- Total cost or budget.
- owner
- Entity that owns the infrastructure.
- operator
- Entity responsible for operations.
- architect
- Architect or architectural firm.
- engineer
- Lead engineer or engineering firm.
- contractor
- Construction contractor.
- length
- Total length.
- width
- Width.
- height
- Height or clearance.
- depth
- Depth (for canals, tunnels, etc.).
- elevation_change
- Total elevation change.
- capacity
- Capacity (passengers, water volume, vehicles, etc.).
- tunnels
- Number of tunnels.
- aqueducts
- Number of aqueduct structures.
- bridges
- Number of bridges.
- locks
- Number of locks (for canals).
- stations
- Number of stations (for railways).
- crosses
- What the infrastructure crosses (rivers, valleys, etc.).
- connects
- What the infrastructure connects.
- materials
- Primary construction materials.
- design_lifespan
- Intended operational lifespan.
- heritage_status
- Heritage or landmark designation.
- website
- Official website.
| Editors can experiment in this template's sandbox (create) and testcases (create) pages. Subpages of this template. |