Template:BSESA mission simulator
From MicrasWiki
Jump to navigationJump to search
Bassaridian Space Program — Initial Expansion Sequence
Active 69, Thalassiel 8 (Chrysen), 54 PSSC · 07:17 (2026-11-02 07:17 UTC)
Current mission: BSESA-054-002 — Selene Global Survey
Current phase: Travel — Micras–Tarsica transfer
Phase ETA: 162, Opsitheiel 40 (Silenian), 54 PSSC · 06:04 · 92.9 days remaining
The schedule is deterministic: every mission begins at the exact completion time of the preceding mission. Reordering or changing a duration in the data module automatically recalculates every later launch.
Live mission telemetry
BSESA-054-002 — Selene Global Survey
Vehicle: Selene Survey Orbiter · Programme: Tarsica programme
Objective: Produce a global orbital map of Tarsica and document protected historic landing sites without surface disturbance.
Operational note: A moving-target intercept is solved from the live Atos ephemeris rather than treating Tarsica as stationary.
| Route | Micras → Tarsica |
|---|---|
| Model | moving-target intercept at 11.20 km/s |
| Nominal distance | 66,877,579 km |
| Travelled / remaining | 28,002,675 km / 38,874,903 km |
| One-way signal delay to Micras | 9.0 min |
Mission queue
| Mission | Programme / vehicle | Status | Start | Completion | Duration | Distance |
|---|---|---|---|---|---|---|
| BSESA-054-001 Asterion Open Relay Commissioning | Micras orbital consolidation Asterion Relay Bus | Completed | 162, Opsitheiel 40 (Silenian), 53 PSSC · 00:00 2026-08-04 00:00 UTC | 180, Opsitheiel 58 (Catosien), 53 PSSC · 08:24 2026-08-22 08:24 UTC | 18.4 days | Local / fixed |
| BSESA-054-002 Selene Global Survey | Tarsica programme Selene Survey Orbiter | Active | 180, Opsitheiel 58 (Catosien), 53 PSSC · 08:24 2026-08-22 08:24 UTC | 6, Atosiel 6 (Atosien), 55 PSSC · 06:04 2027-03-02 06:03 UTC | 191.9 days | 66,877,579 km |
| BSESA-054-003 Thalassan Precision Landing Demonstration | Tarsica programme Thalassan Lander | Queued | 6, Atosiel 6 (Atosien), 55 PSSC · 06:04 2027-03-02 06:03 UTC | 69, Thalassiel 8 (Chrysen), 56 PSSC · 21:03 2027-11-03 21:03 UTC | 246.6 days | 327,411,194 km |
| BSESA-054-004 Golden Shadow Sterile Sample Return | Tarsica programme Golden Shadow Returner | Queued | 69, Thalassiel 8 (Chrysen), 56 PSSC · 21:03 2027-11-03 21:03 UTC | 162, Opsitheiel 40 (Silenian), 57 PSSC · 10:07 2028-08-05 10:07 UTC | 275.5 days | 261,938,452 km |
| BSESA-054-005 Lighthouse Indigo Relay | Indigo system programme Lighthouse Deep Relay | Queued | 162, Opsitheiel 40 (Silenian), 57 PSSC · 10:07 2028-08-05 10:07 UTC | 51, Atosiel 51 (Indomin), 58 PSSC · 06:47 2028-10-16 06:46 UTC | 71.9 days | 75,368,901 km |
| BSESA-054-006 Bacchic Indigo Satellite Survey | Indigo system programme Bacchic Surveyor | Queued | 51, Atosiel 51 (Indomin), 58 PSSC · 06:47 2028-10-16 06:46 UTC | 85, Thalassiel 24 (Thalassian), 59 PSSC · 15:19 2029-05-21 15:18 UTC | 217.4 days | 255,168,306 km |
| BSESA-054-007 Chryosian Belt Resource and Habitat Survey | Asteroid research and industry Bacchic Surveyor | Queued | 85, Thalassiel 24 (Thalassian), 59 PSSC · 15:19 2029-05-21 15:18 UTC | 127, Opsitheiel 5 (Opsithia), 61 PSSC · 22:25 2030-07-03 22:25 UTC | 1.12 years | 178,445,619 km |
Mission log — BSESA-054-002
| Mission time | Log entry |
|---|---|
| 180, Opsitheiel 58 (Catosien), 53 PSSC · 08:24 2026-08-22 08:24 UTC | Mission sequence authority transferred to BSESA-054-002; preparation begins after completion of the preceding mission. |
| 180, Opsitheiel 58 (Catosien), 53 PSSC · 08:24 2026-08-22 08:24 UTC | Preparation begins: Orbiter checkout and heritage-plan approval. The flight plan is screened against the protected locations associated with Lucien-on-Tarsica, the USS Empire, and the Hamland landing. |
| 182, Opsitheiel 60 (Catosien), 53 PSSC · 20:24 2026-08-24 20:24 UTC | Mid-phase review: Orbiter checkout and heritage-plan approval is at 50% of scheduled duration; navigation, safety, communications, and programme constraints remain under review. |
| 2, Atosiel 2 (Atosien), 54 PSSC · 08:24 2026-08-27 08:24 UTC | Travel begins: Micras–Tarsica transfer. A moving-target intercept is solved from the live Atos ephemeris rather than treating Tarsica as stationary. |
| 2, Atosiel 2 (Atosien), 54 PSSC · 08:24 2026-08-27 08:24 UTC | Preparation completed: Orbiter checkout and heritage-plan approval. |
| 82, Thalassiel 21 (Thalassian), 54 PSSC · 07:14 2026-11-15 07:13 UTC | Next scheduled event: Mid-phase review: Micras–Tarsica transfer is at 50% of scheduled duration; navigation, safety, communications, and programme constraints remain under review. |
Display behaviour: Lua evaluates the mission state from the current Unix time whenever MediaWiki parses this page. The simulated clock continues mathematically between visits, but the visible page does not animate in the browser. Refreshing or purging the page recalculates the display. Administrators can install a no-cache extension or a small JavaScript gadget for a visibly ticking countdown.
Usage
{{BSESA mission simulator}}
Show more queued missions:
{{BSESA mission simulator|future=13}}
Show one mission's log:
{{BSESA mission simulator|mission=BSESA-054-008}}
Test a historical or future Unix timestamp without changing the live campaign:
{{BSESA mission simulator|now=1787702400}}