Land of the mountain goats

Nuclear power in Aerla

From MicrasWiki
Jump to navigationJump to search

Nuclear power in Aerla is an important focal point of Aerlan energy production. The first reactor was constructed in the rural village of Blackburn in 1725 AN, and was completed 7 years later in 1732 AN. A second reactor was soonafter began constructed in Sanjir, Hatay, which was finished in 1739 AN.

Both reactors are managed by National Energy, the state owned energy conglomerate

Plants

Name Unit

No.

Reactor Status Net capacity (MW) Construction start Commercial operation Closure
Type
Blackburn 1 BWR OPERATIONAL 903 1725 AN 1732 AN -
Sanjir 2 PWR OPERATIONAL 813 1734 AN 1739 AN -