The '''{{PAGENAME}}''' will be an international railway route initially spanning the northern regions of [[Keltia]]. The first phase of construction is planned to be a high-speed line between [[Mercury (city)|Mercury]] and [[Hagbard]], thus connecting the Mercurian capital with all major cities of [[Normark]] through Normark's internal railway system, up and to [[Nordiskehjem]] in the north-west.
The '''{{PAGENAME}}'''is an international railway route initially spanning the northern regions of [[Keltia]]. Construction began with a high-speed line between [[Mercury (city)|Mercury]] and [[Hagbard]], thus connecting the Mercurian capital with all major cities of [[Normark]] through Normark's internal railway system, up and to [[Nordiskehjem]] in the north-west.


For [[Normark]], the project includes building a railway crossing in the form of a tunnel under the [[Norse Gate]], thus connecting [[Hagbard]] in the east of the [[Strait of Haifa]] with [[Signe]] in the west, and the rest of Normark.
For [[Normark]], the project included building a railway crossing in the form of a tunnel under the [[Norse Gate]], thus connecting [[Hagbard]] in the east of the [[Strait of Haifa]] with [[Signe]] in the west, and the rest of Normark.


==Route==
==Route==

Revision as of 22:44, 11 May 2021

Trans-Keltian Express
logo of the Trans-Keltian Express
Overview
Status Under construction (since 1685 AN)
Location Keltia
Termini Mercury Mercury, Elwynn Nordiskehjem
Stations 10 (5 in Mercury, 5 in Normark)
Routes Mercury to Nordiskehjem (Line TK1)
Operation
Opened 1694 AN
Owner Trans-Keltia Railways
Operator(s) Various
Depot(s) Mercury, Mercury
Požun, Mercury
Hagbard, Normark
Technical
Line length 7,158km (4,448 mi)
No. of tracks Double track throughout
Track gauge 1,435 mm (4 ft 8 1⁄2 in)
standard gauge
Electrification 25kV 60Hz AC OHLE
Operating speed TBD
Route
Map The planned route of the Trans-Keltian Express
Route

The Trans-Keltian Expressis an international railway route initially spanning the northern regions of Keltia. Construction began with a high-speed line between Mercury and Hagbard, thus connecting the Mercurian capital with all major cities of Normark through Normark's internal railway system, up and to Nordiskehjem in the north-west.

For Normark, the project included building a railway crossing in the form of a tunnel under the Norse Gate, thus connecting Hagbard in the east of the Strait of Haifa with Signe in the west, and the rest of Normark.

Route

The Trans-Keltian Express route begins in Nordiskehjem, moving southwards towards Elijah's Rest, where it turns south-eastwards to cross the span of Normark. The line passes beneath the Norse Gate via a tunnel, then continues southwards towards Hagbard. On leaving Hagbard, the line turns sharply towards the east, where it heads towards Mercury.

After crossing the Mercurian border into Osktrava, it winds its way through the valley where the Výsoký Východný and Nízky Východný meet. As it heads towards the city of Požun, it runs alongside the shores of Bavičký pleso, before passing through a tunnel underneath the northern face of Čistý Štíť. The route arrives in Požun, where it continues north-eastwards towards Košťova, approximately following the route of the Rýchla. After Košťova, the line continues into Moorshire, bypassing the city of North Eastmoor to the south, and instead taking a sharp turn northwards towards Harlby. The route passes through Nafferton without stopping, on its journey towards Taylor. The line is planned to extend into the central station within Taylor, which would force the train to reverse out of the station on the last leg towards Mercury, where it terminates.

Construction

The initial phase of construction began in 1686 AN with the extension of Mercury's existing network towards Castilona and Qavaqaqqaqqaniitqeqertaq. The second phase, the westbound extension of the line from Požun towards the border with Normark, began in 1690 AN, and was completed in 1694 AN.