Nuví Pelezu Metro
From MicrasWiki
Jump to navigationJump to search
This article or section is a work in progress. The information below may be incomplete, outdated, or subject to change. |
Nuví Pelezu Metro | |
Native name |
Нувѝ Пелешки Метро Nuví Peleški Metro |
---|---|
Owner | Nuví Pelezu Railways |
Locale | Nuví Pelezu |
Transit type | Rapid transpit |
Number of lines | 2 |
Number of stations | TBD |
Daily ridership | TBD (2018) |
Annual ridership | TBD (2018) |
Began operation | November 2018 |
Operator | Nuví Pelezu Railways |
Headway | 5 minutes |
Number of vehicles |
TBD (active) TBD (reserve) |
System length | TBD km (TBD mi) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Average speed | TBD km/h (TBD mph) |
Top speed | TBD km/h (TBD mph) |
The Nuví Pelezu Metro is a rapid transit railway network that serves the city of Nuví Pelezu, largest city of Krasnarus, Krasnocoria. Metro was opened in November of 2018, consisting of two lines, TBD stations and the total length of TBD kilometers.
Rolling stock
Designation | Producer | Total units | Units in service | Power output | Top speed | Years built | Image |
---|---|---|---|---|---|---|---|
PK-100 | FVR | TBD | TBD | 2600 kW | 160 km/h (99 mph) |
2018 |