Project Microburst/Test 1 Report: Difference between revisions
From MicrasWiki
Jump to navigationJump to search
Caradia Gov (talk | contribs) m (Caradia Gov moved page Project Microburst/Test 1 Document to Project Microburst/Test 1 Report) |
Caradia Gov (talk | contribs) No edit summary |
||
Line 22: | Line 22: | ||
'''Objectives:''' | '''Objectives:''' | ||
#Activate WC-1 | |||
#Ascertain wind speed via anemometer and target | |||
#Maneuver WC-2 into position perpendicular to WC-1 | |||
#Determine effects of crosswind | |||
#Power down WC-1 and WC-2 | |||
'''Contingencies:''' | '''Contingencies:''' | ||
#WC-1 or WC-2 fail to activate | |||
#*Power down active WCs | |||
#*Abort test | |||
#*Return failed asset to engineering department for analysis | |||
#Target fails to detect pressure | |||
#*Power down WCs | |||
#*Abort test | |||
#*Return failed asset to engineering department for analysis | |||
#Control of either WC lost | |||
#*Evacuate test chamber | |||
#*Power down active WCs | |||
#*Attempt remote power down of triggering WC | |||
#*Remote power down fails | |||
#**Cut electricity to test chamber | |||
#*Abort test | |||
#*Return failed asset to engineering department for analysis | |||
'''Summary:''' | '''Summary:''' |
Revision as of 20:12, 22 January 2020
Project: Microburst
Phase: I
Test: 1
Location:
- Test Chamber UG-Alpha
- Mobius Research Station, Antarctic Sea
Materials:
- Pressure sensitive testing target (target)
- Anemometer
- Zephyros Wind Cannon 1 (WC-1)
- Zephyros Wind Cannon 2 (WC-2)
Goal:
- Activate cannon, ascertain wind speed, and perform crosswind tests
Objectives:
- Activate WC-1
- Ascertain wind speed via anemometer and target
- Maneuver WC-2 into position perpendicular to WC-1
- Determine effects of crosswind
- Power down WC-1 and WC-2
Contingencies:
- WC-1 or WC-2 fail to activate
- Power down active WCs
- Abort test
- Return failed asset to engineering department for analysis
- Target fails to detect pressure
- Power down WCs
- Abort test
- Return failed asset to engineering department for analysis
- Control of either WC lost
- Evacuate test chamber
- Power down active WCs
- Attempt remote power down of triggering WC
- Remote power down fails
- Cut electricity to test chamber
- Abort test
- Return failed asset to engineering department for analysis
Summary:
- Experiment successful. Wind speeds in excess of 325 km/h. Anemometer and target destroyed.
Recommendations:
- Request engineering department develop more resilient testing materials.
- Proceed to next wave of testing.
Dr. Arthur Hammond