Talenore Arsenal: Difference between revisions
From MicrasWiki
Jump to navigationJump to search
Continuator (talk | contribs) Created page with "{{SANE article}} The '''{{PAGENAME}}''', upon which work commenced with a ground-breaking ceremony on 12.IX.1670, is a joint ESB-Sadri Industries subterranean manufacturing..." |
Continuator (talk | contribs) mNo edit summary |
||
| Line 2: | Line 2: | ||
The '''{{PAGENAME}}''', upon which work commenced with a ground-breaking ceremony on 12.IX.1670, is a joint ESB-Sadri Industries subterranean manufacturing facility and storage depot located centrally on [[Talenore]] island and operated under the auspices of the [[Allied Production Matrix]] of the [[Raspur Pact]]. | The '''{{PAGENAME}}''', upon which work commenced with a ground-breaking ceremony on 12.IX.1670, is a joint ESB-Sadri Industries subterranean manufacturing facility and storage depot located centrally on [[Talenore]] island and operated under the auspices of the [[Allied Production Matrix]] of the [[Raspur Pact]]. After two-hundred and twenty-eight days the arsenal was certified as fully operational as of 12.III.1671. | ||
==Background== | |||
==Design and construction== | |||
==The facility== | |||
===Launch complexes=== | |||
===Production levels=== | |||
===Storage levels=== | |||
===R&D levels=== | |||
===Security zone and perimeter defences=== | |||
[[Category:Talenore]][[Category:ESB Group]][[Category:Military]] | [[Category:Talenore]][[Category:ESB Group]][[Category:Military]] | ||
Revision as of 21:45, 5 April 2019
The Talenore Arsenal, upon which work commenced with a ground-breaking ceremony on 12.IX.1670, is a joint ESB-Sadri Industries subterranean manufacturing facility and storage depot located centrally on Talenore island and operated under the auspices of the Allied Production Matrix of the Raspur Pact. After two-hundred and twenty-eight days the arsenal was certified as fully operational as of 12.III.1671.