Fort Alexandria: Difference between revisions
From MicrasWiki
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 28: | Line 28: | ||
| general_contractor = | | general_contractor = | ||
| main_contractors = | | main_contractors = | ||
| capacity = 80,000 | | capacity = 80,000 <br> 77,500 (FFL) | ||
| suites = 250 | | suites = 250 | ||
| record_attendance = | | record_attendance = | ||
Revision as of 18:50, 25 September 2026
| Fort Alexandria | |
| | |
| Location | San Alexandria, Floria |
|---|---|
| Broke ground | 2020 |
| Built | 2020-21 |
| Opened | 2021 |
| Operator | Real Alexandria |
| Surface | hybrid grass |
| Scoreboard | Electronic |
| Construction cost | Cr 100 Million |
| Capacity |
80,000 77,500 (FFL) |
| Executive suites | 250 |
| Field dimensions | 105 by 68 metres |
| Tenants | |
|
Real Alexandria Inter Alexandria (2021-23), (2026-) | |